Power PFS Rukwa Coal to Power Project Update

RNS Number : 4212Z
Kibo Mining Plc
11 December 2014
 



Kibo Mining Plc (Incorporated in Ireland)

(Registration Number: 451931)

(External registration number: 2011/007371/10)

Share code on the JSE Limited:KBO Share code on the AIM:KIBO

ISIN: IE00B61XQX41

("Kibo" or "the Company")

 

 

Dated: 11 December 2014

 

 

Power Pre-Feasibility Update - Rukwa Coal to Power Project

 

 

Kibo Mining plc ("Kibo" or the "Company") (AIM: KIBO; AltX: KBO), the Tanzania focussed mineral exploration and development company, is pleased to confirm that the Company has now received the Power Pre-Feasibility Study Report, covering the power generation element of the Rukwa Coal to Power Project ("RCPP").


Two Components to the RCPP - Coal Mining and Power Generation


Within our announcement of 1 December 2014 we advised shareholders that the Phase 1, Stage 1 report in respect of the RCPP Definitive Mining Feasibility Study ("DMFS") covering the coal mining component of the RCPP, had been received by the Company. That report significantly exceeded our expectations. We further announced to market on 9 December 2014 the key findings of this report, which highlighted a conservatively calculated project NPV range of between US$116m and US$141m at a 5.7% discount rate and an average annual mining margin of between US$14.8m to US$19.4m per annum.


The second component of the RCPP, and the subject of this announcement, is power generation which, when combined with the coal mining component, dramatically enhances the value of the project as a whole.

Background to Study


The Power Pre-Feasibility Study ("PPFS") conducted by Aurecon, was commissioned by the Company as announced to market on 10 November 2014. Recognising the wealth of data available to Aurecon from historic RCPP work programmes, we were able to accelerate completion of this study and the estimated early December delivery has been met by our independent advisers. We would like to thank Aurecon for their expediency, diligence and professionalism shown in the timely delivery of this study and during the course of their work. 


Power Pre-Feasibility Study - Report Overview


We are now pleased to confirm that the PPFS report has also exceeded the Company's expectations in terms of the robustness of overall project economics including notably, the deliverable underlying forecast free cash flow, based on preliminary internal financial modelling of the relevant results from the PPFS Report and DMFS Phase 1, Stage 1 Report. This is highly significant, demonstrating the potential for the project to achieve an accelerated payback of capital expended on project development and thus reducing the project risk profile. This factor greatly assists the Company particularly when considering our ability to conclude the best terms with prospective commercial partners. We are now reviewing the PPFS report in detail and will prepare an update to shareholders with regard to the report contents.

In both the coal mining and power generation components, the Company and our advisors consistently adopted prudent assumptions, duly reflected in the preparation and delivery of the feasibility reports received to date. Notwithstanding this prudent approach, the unique nature of the RCPP meant that we always expected project economics would be strong. The advisers' technical work completed thus far has demonstrably proven that to be the case.


Moreover, the entirety of our work has never wavered from the key principles that the RCPP must be developed in a manner that properly reflects the local, regional and national need for near term energy solutions, whilst delivering cost effective power to enhance the lives of the Tanzanian people.


Detailed PPFS Announcement to Follow


A review of the PPFS report is now underway and a separate update announcement will be provided to shareholders in due course.  This update will focus on a summary of power generation operations and key financial data related to the power generation component of the RCPP.


Louis Coetzee, CEO of Kibo Mining plc said "We are extremely pleased to receive this second key report covering the power generation component of the RCPP. In particular the underlying free cash flow demonstrated, underpins project viability, reduces risk and considerably enhances the economic attractiveness of the RCPP.


The RCPP was pursued for the exponential opportunity a combined coal mining and power generation operation offered Kibo and its shareholders. We were delighted to receive positive findings for the coal mining element and now even more so for the power generation element. The value being independently identified within the two reports clearly demonstrates that the RCPP is a substantially valuable and transformational asset for the Company.  


We are also anticipating finalisation of the Preliminary Economic Assessment report for our Imweru Gold project, another asset that we consider holds considerable financial and strategic value to Kibo."

 


Contacts

Louis Coetzee

+27 (0) 83 2606126

Kibo Mining plc

Chief Executive Officer

Andreas Lianos

+27 (0) 83 4408365

River Group

Corporate Adviser and Designated Adviser on JSE

Jon Belliss

Abigail Wayne

+44 (0) 20 3693 1470

Hume Capital Securities Plc

Broker

Oliver Morse and Trinity McIntyre

+61 8 9480 2500

RFC Ambrian Limited

Nominated Adviser on AIM

Daniel Thöle

Lucinda Alderson

+44 (0) 203 772 2500

 

 Bell Pottinger

Investor and Media Relations

 

Kibo Mining - Notes to editors

Kibo Mining is listed on the AIM market in London and the AltX in Johannesburg. The Company is focused on exploration and development of mineral projects in Tanzania, and controls one of Tanzania's largest mineral right portfolios. Tanzania provides a secure and stable operating environment for the mineral resource industry and Kibo Mining therein.

 

Kibo Mining holds a thermal coal deposit at Rukwa, which has a significant NI43-101 compliant defined resource (See Table 1 below) and is developing a 250-350MW mouth-of-mine thermal power station with an established management team that includes Standard Bank as Financial Advisor.  Kibo is undertaking a Coal Mining Definitive Feasibility Study (DMFS) and a Power Pre-Feasibility Study (PPFS) for Rukwa with initial findings for the PPFS to be released in the near term.

 

The Company also has extensive gold focused interests including Lake Victoria Goldfields and Morogoro projects. At Lake Victoria, the Company has projects with a 550,000oz JORC compliant gold Mineral Resource at Imweru Project (See Table 2 below) and a 168,000oz NI 43-101 compliant gold Mineral Resource at Lubando Project (See Table 3 below) in which the Company holds a 90% attributable interest. The Company is currently undertaking a Definitive Feasibility Study on its Imweru Project, with Preliminary Economic Assessment study findings to be released in the near term.

 

Kibo also holds the Haneti Project on which the latest technical report confirms prospectivity for nickel, PGMs, gold and strategic metals including Lithium.

 

Kibo Mining further holds the Pinewood (coal & uranium) project where the company has signed a MOU to enter into a 50/50 Exploration Joint Venture with Metal Tiger PLC.

 

The Company's projects are located in the established and gold prolific Lake Victoria Goldfields, the emerging goldfields of eastern Tanzania and the Mtwara Corridor in southern Tanzania where the Government has prioritised infrastructural development attracting significant recent investment in coal and uranium. The Company has a positive working relationship with the Tanzanian government at local, regional and national levels and works hard to maintain positive relationships with all communities where company interests are held.  The Company recognises the potential to enhance the quality of life and opportunity for Tanzanian citizens through careful development of its projects.

 

Updates on the Company's activities are regularly posted on its website www.kibomining.com    

 

Technical data

 

Rukwa Mineral Resource

Table 1 below presents a table showing the Mineral Resource estimate for the Rukwa Coal Project. The table is taken from an NI 43 101-Compliant Report by GEMECS (Pty) Ltd dated April 2012.

 

 

 

 

Table 1

RUKWA COAL RESOURCE SUMMARY- GEMECS (Pty) Ltd


SEAM

NI 43-101

IN SITU

SEAM

THICKNESS

CLASS

MILLION TONS

S4

1.14

Indicated

2.17

S3U

2.04

Indicated

6.92

S3L

2.3

Indicated

12.63

S2

3.45

Indicated

23.43

S1U

2.48

Indicated

7.34

S1L

2.92

Indicated

17.4

S0

1.08

Indicated

1.44

Total Indicated Resources


71.34

S4

1.31

Inferred

1.38

S3U

2.24

Inferred

2.94

S3L

2.27

Inferred

3.86

S2

3.42

Inferred

7.94

S1U

2.05

Inferred

6.5

S1L

3.15

Inferred

12.83

S0

1.06

Inferred

2.6

Total Inferred Resources


38.05

TOTAL RESOURCES


*109.39

*Kibo holds 100% of the Rukwa Mineral Resource

 

Imweru Mineral Resource

Table 2 below presents a table showing the Mineral Resource estimate for the Imweru Project  at  a base case economic cut-off grade for the reporting of the resource  of  0.4 g/t. The table is taken from a JORC-Compliant Report by Tetra Tech EBA dated February 2014.

 

Table 2

 

Area

Material Type

 

Classification

Cut- off (g/t)

Specific Gravity

Metric Tonnes (t)

 

Short Tons

Gold Grade (g/t)

Contained Gold Ounces (troy)

 

Central

Laterite

Indicated

0.40

2.50

131,000

144,000

1.785

8,000

Saprolite

Indicated

0.40

2.50

706,000

778,000

1.387

32,000

Bedrock

Indicated

0.40

2.89

1,895,000

2,089,000

1.043

64,000

Total

Indicated

0.40

2.77

2,732,000

3,012,000

1.168

103,000

 

Central


Laterite

Inferred

0.40

2.50

685,000

755,000

1.317

29,000

Saprolite

Inferred

0.40

2.50

1,047,000

1,154,000

1.040

35,000

Bedrock

Inferred

0.40

2.89

7,838,000

8,640,000

1.029

259,000

Total

Inferred

0.40

2.82

9,569,000

10,548,000

1.051

323,000


East

Total

Inferred

0.40

2.70

2,653,000

2,925,000

1.449

124,000


 

Imweru Property Total

Indicated

0.4

2.77

2,732,000

3,012,000

1.168

103,000

Inferred

0.4

2.79

12,222,000

13,473,000

1.137

447,000

Combined (inf+ind)

0.4

2.79

14,954,000

16,485,000

1.143

550,000

*    Kibo holds 90% of the Imweru Mineral Resource

*   Total estimates are rounded, based on composites capped at 26 g/t gold at Imweru Centraland 25 g/t at Imweru East, the cut-off grade isbased on a gold price of US$1,200 and a 90%  metallurgical recovery is assumed in calculation of cut-offgrade. A base case of  0.40  g/t has been selected.

** Classification of MineralResources incorporates the terms and definitions from the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) published bythe Joint Ore Reserve Committee (JORC)

 

Lubando Mineral Resource

Table 3 below presents a table showing the Mineral Resource estimate for the Lubando Project at a base case economic cut-off grade for the reporting of the resource of 0.5 g/t Au. The table is taken from an NI 43 101-Compliant Report by EBA Engineering Consultants Limited (now part Tetra Tech EBA) dated August 2009.

 

TABLE3: LUBANDO MINERALRESOURCE SUMMARY - BASECASE*

 

Category

 

West Zone

East Zone South

 

East Zone Mid

East Zone North

 

Total

Measured Resource






Measured Resource(t)

107,900

4,880

16,900

54,440

184,150

Grade(g/t)

1.69

2.52

1.72

2.48

1.95

Total Gold(oz)

5,900

400

950

4,340

11,500

Indicated Resource






Indicated Resource(t)

280,710

18,330

61,000

149,350

509,420

Grade(g/t)

1.61

2.23

1.89

2.73

1.99

Total Gold(oz)

14,500

1,300

3,700

13,120

32,600

Inferred Resource






Total Resource(t)

1,090,000

65,470

209,340

535,330

1,900,140

Grade(g/t)

1.27

1.56

3.34

3.13

Total Gold(oz)

44,550

3,300

22,500

53,900

124,200

*Kibo holds 90% of the Lubando Mineral Resource

* Numbers are rounded. Composites capped at 10.85g/t gold. Cut-off grade of 0.5 g/t gold based on a gold price of US$850/oz and assumed 100% metallurgical recovery.CIM definitions were followed for Mineral Resources.

 

Pursuant to the terms of an inherited agreement with Barrick East Africa Exploration LTD (BEAL), Kibo currently has an effective 90% interest in the Imweru and Lubando Project (and thus a 90% attributable interest in the Imweru and Lubando Mineral Resources shown in Table 2 and 3 above), with Barrick having a 10% carried interest up to a decision to mine at which point they have to contribute or be diluted to a 2% net smelter royalty. BEAL also has a first right of refusal pursuant to which they can buy the 90% interest in the project at an agreed market related value after completion of a Bankable Feasibility Study.  Kibo remains the operator of the project.

 

Review by Qualified Persons

 

The information in this announcement that relates to the Rukwa Coal Mineral Resource is taken from a report titled "Independent Technical Report for the Rukwa Coal Project, Mbeya Region, United Republic of Tanzania" dated 19th April 2012 by CD van Niekerk Director and Principal Geologist with the firm GEMECS (Pty) Ltd. Mr van Niekerk is a Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), Registration No. 400066/98 and a Fellow Member of the Geological Society of South Africa. He has relevant experience and technical qualifications to be a "Qualified Person" for reporting coal resources to the NI 43-101 Standard

Information in this announcement that relates to the Imweru Mineral Resource is taken from the report titled "Resource Update for the Imweru Property Geita Region Northern, Tanzania, JORC Competent Persons Report" dated February 17th 2014 (the "Report"). The Report states a JORC-compliant Mineral Resource estimate and was prepared for Kibo Mining plc by James Barr P.Geo. and Darryn Hitchcock P.Geo. Senior Geologist and Geologist respectively with TetraTech EBA Ltd. Both Mr. Barr and Mr. Hitchcock are registered as Certified Professional Geologists with Association of Professional Engineers and Geoscientists of British Columbia a recognised professional organisation. Mr Barr as principal author responsible for the Report has experience in the evaluation and reporting of Archaean Gold projects and is a "Qualified Person" for reporting gold resources to the JORC Standard. He consents to the inclusion in this document of the matters based on his information in the form and context in which they appears. 

 

The information in this announcement that relates to the Lubando Mineral Resources is taken from a report titled  "Technical Report on the Lubando property, Mwanza, Tanzania" dated 31st  August 2009" (the "Report") The  Report is NI 43-101 compliant and was prepared for Great Basin Gold Rusaf Gold Limited by Nathan Eric Fier C.P.G., P.Eng. Market Director for EBA Engineering Consultants Ltd and a Senior Mining Consultant. Mr. Fieris registered as a Certified Professional Geologist with the American Institute of Professional Geologists, Registration No 10062, and a professional Engineer in British Columbia, Canada Registration No. 135165. He has extensive experience in the evaluation and reporting of Archaean Gold projects.

 

The Company's Exploration Director, Noel O'Keeffe has reviewed the resource reports and the references to them in this announcement.

 

Johannesburg

11 December 2014

Corporate and Designated Adviser

River Group

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEASAEFEALFFF
UK 100

Latest directors dealings