Major Discovery in Madagascar

Jubilee Platinum PLC 05 September 2005 5 September 2005 AIM: JLP JUBILEE PLATINUM PLC ('Jubilee' or 'the Company') Jubilee Makes a Major Discovery in Madagascar Drilling Intersects 70 metres of Nickel-Copper-Platinum-Palladium Mineralisation Jubilee is pleased to announce the results of its first borehole LAV1 drilled on the Lavatrafo property (Londokomanana Project) in Madagascar. The Londokomanana Project is located approximately 150 kilometres north of the Madagascan capital Antananarivo. Highlights • Drilling intersects a 70 metre-wide multi-metal (nickel-copper-platinum-palladium) formation at shallow depth (37metres) • Intersection over the entire width (from 38metres to 108metres) grades 0.23% nickel (Ni); 0.11% copper (Cu) and 1.05g/t 3E (platinum (Pt), palladium (Pd) and gold (Au)) (The full results are appended below) • Pt to Pd ratio is 1 to 1 • Copper equivalent of the total intersection is 1.56% at current metal prices as of 2nd September 2005 • In-situ value of total intersection is US$56/t rock at those metal prices Intersection includes • 6.2 metres (from 55.6m to 61.8m) grading 2.47 g/t 3E and From metres To Interval % Cu In-situ value $/t (at metres metres % Ni % Cu g/t 3E equiv. current prices) 72.8 108.4 35.7 0.31 0.19 0.99 1.9 69 89.4 108.4 19.1 0.34 0.20 1.05 2.1 74 75.3 83.5 8.3 0.32 0.23 1.15 2.1 75 102.3 108.4 6.1 0.47 0.24 1.02 2.6 95 • Wide intercept and shallow depth ideal for open pit mining • Intersection proves recently established geophysics model • Potential for large regional development since the combination of geophysics and sampling in the area suggests the system may extend over 35 kilometres. An industry accepted model for a bulk mining operation producing not less than 8 million tonnes per year is believed to be approximately US$20/tonne production cost made up of approximately US$11 per tonne as direct operating cost and US$9 per tonne for capital recovery. Set Point Laboratories (ISO 17025 Accredited and SANAS Accredited to 223) in Johannesburg, South Africa carried out the analyses of the drill core samples. Colin Bird, CEO of Jubilee, said 'The size and scope of this discovery bears all the fundamentals required for a world-class resource combining good grades with a suite of metals sought after in the market. The thickness of the intersection provides the potential for large-scale mining and the confirmation of our evolving model from the recent geophysics programme, suggests that Londokomanana could develop into a regional, as opposed to a local situation, with some 35 kilometres of ground, some of which has been tested with similar geophysics. Further drilling, some 180 metres south and along strike, is confirming continuity of the formation. Results will be released as soon as these become available. Hennie Blignault, Consulting Geologist to Jubilee said 'This discovery outside the South African Bushveld Complex is extremely significant in world terms.' Mr. Blignault is a former group geologist for Gold Fields of South Africa and was a lecturer and research associate at the University of the Orange Free State and the University of Cape Town. For further information please contact: Colin Bird Cathy Malins / Annabel Leather Jubilee Platinum plc Parkgreen Communications Ltd Tel: 07768 397 627 Tel +44 20 7493 3713 Appendix 1 Londokomanana Project - Drill results for Borehole LAV1 Grade Sample From To Interval Au Pt Pd Ni Cu 3E no. m m m ppb ppb ppb ppm ppm g/t S7180 36.50 37 0.50 <10 90 60 1184 81 0.15 S7181 37.00 37.72 0.72 <10 540 495 408 38 1.04 S7182 37.72 38.06 0.34 145 185 265 1900 1449 0.60 S7183 38.06 39.06 1.00 175 140 195 2040 1462 0.51 S7184 39.06 39.86 0.80 175 190 180 2041 1518 0.55 S7185 39.86 40.8 0.94 130 335 315 1724 720 0.78 S7186 40.80 41.8 1.00 90 125 150 2516 1855 0.36 S7187 41.80 42.38 0.58 155 155 160 2644 1787 0.47 S7188 42.38 42.93 0.55 95 190 235 1852 803 0.52 S7189 42.93 43.69 0.76 60 1120 995 1963 418 2.18 S7190 43.69 44.49 0.80 115 890 965 1755 494 1.97 S7191 44.49 44.87 0.38 50 155 200 1810 335 0.40 S7192 44.87 45.63 0.76 135 740 780 1784 898 1.66 S7193 45.63 46.57 0.94 130 980 515 1721 558 1.63 S7194 46.57 47.57 1.00 30 1310 1020 1673 158 2.36 S7195 47.57 48.6 1.03 20 615 400 1474 94 1.04 S7196 48.60 49.6 1.00 20 110 90 1174 111 0.22 S7197 49.60 50.6 1.00 <10 80 50 1347 14 0.13 S7198 50.60 51.6 1.00 <10 85 80 1321 15 0.16 S7199 51.60 52.6 1.00 <10 270 165 1311 13 0.44 S7200 52.60 53.6 1.00 <10 50 35 1303 29 0.08 S7201 53.60 54.6 1.00 <10 115 90 1287 21 0.21 S7202 54.60 55.6 1.00 <10 325 230 1366 24 0.56 S7203 55.60 56.6 1.00 <10 625 400 1390 46 1.03 S7204 56.60 57.6 1.00 15 2130 1550 1391 65 3.70 S7205 57.60 57.83 0.23 35 4335 2730 1337 23 7.10 S7206 57.83 58.83 1.00 <10 850 745 1362 40 1.60 S7207 58.83 59.83 1.00 15 935 880 1414 37 1.83 S7208 59.83 60.83 1.00 <10 435 530 1382 26 0.97 S7209 60.83 61.83 1.00 25 1785 2805 1474 70 4.62 S7210 61.83 62.36 0.53 <10 135 185 1396 <10 0.32 S7211 62.36 62.8 0.44 15 885 915 1505 10 1.81 S7212 62.80 63.8 1.00 <10 165 175 1312 16 0.34 S7213 63.80 64.12 0.32 <10 415 180 1137 <10 0.60 S7214 64.12 65 0.88 <10 160 215 1213 <10 0.38 S7215 65.00 66 1.00 <10 240 380 1454 13 0.62 S7216 66.00 67.08 1.08 <10 780 700 1439 1.48 S7217 67.08 67.75 0.67 25 1965 3005 1328 31 5.00 S7218 67.75 68.75 1.00 10 540 885 1626 57 1.44 S7219 68.75 69.75 1.00 <10 25 20 1520 44 0.04 S7220 69.75 70.75 1.00 <10 10 10 1495 13 0.02 S7221 70.75 71.75 1.00 60 30 20 1692 255 0.11 S7222 71.75 72.75 1.00 55 15 15 1636 264 0.08 Londokomanana Project - Drill results for Borehole LAV1 Grade Sample From To Interval Au Pt Pd Ni Cu 3E no. m m m ppb ppb ppb ppm ppm g/t S7223 72.75 73.37 0.62 85 30 30 2086 700 0.14 S7224 73.37 73.84 0.47 135 95 75 2040 1065 0.31 S7225 73.84 74.52 0.68 65 110 90 2308 748 0.27 S7226 74.52 75.26 0.74 25 25 25 1061 242 0.08 S7227 75.26 75.88 0.62 215 785 525 1778 2829 1.53 S7228 75.88 77.35 1.47 535 535 405 3540 1610 1.48 S7229 77.35 78.35 1.00 220 340 390 2904 2970 0.95 S7230 78.35 79.31 0.96 320 345 385 3555 2649 1.05 S7231 79.31 80.05 0.74 305 525 540 3131 2244 1.37 S7232 80.05 80.85 0.80 200 445 475 3429 2156 1.12 S7233 80.85 81.1 0.25 160 495 485 2298 1157 1.14 S7234 81.10 81.51 0.41 90 315 310 3121 2050 0.72 S7235 81.51 82.51 1.00 135 320 375 3086 2033 0.83 S7236 82.51 83.51 1.00 210 435 475 3732 2825 1.12 S7237 83.51 84.79 1.28 140 365 365 2919 1800 0.87 S7238 84.79 85.24 0.45 115 560 525 2338 1522 1.20 S7239 85.24 85.77 0.53 60 230 265 2671 1104 0.56 S7240 85.77 86.72 0.95 75 245 280 2783 1333 0.60 S7241 86.72 87.78 1.06 200 600 850 2626 1804 1.65 S7242 87.78 88.6 0.82 70 175 215 1384 708 0.46 S7243 88.60 89.35 0.75 160 450 535 2363 1549 1.15 S7244 89.35 90.43 1.08 365 1060 980 3575 3467 2.41 S7245 90.43 91.41 0.98 135 525 735 3540 1782 1.40 S7246 91.41 92.11 0.70 375 700 810 2934 2121 1.89 S7247 92.11 92.85 0.74 135 660 745 3586 2490 1.54 S7248 92.85 93.85 1.00 75 230 295 2320 916 0.60 S7249 93.85 94.85 1.00 155 440 505 3510 2150 1.10 S7250 94.85 95.85 1.00 85 205 305 2540 989 0.59 S7251 95.85 96.85 1.00 115 470 430 2690 1316 1.02 S7252 96.85 97.42 0.57 70 200 285 2530 1471 0.56 S7253 97.42 98.42 1.00 130 390 460 3000 1668 0.98 S7254 98.42 99.42 1.00 90 445 580 3150 2090 1.11 S7255 99.42 100.42 1.00 75 265 245 1970 993 0.58 S7256 100.42 101.39 0.97 160 245 370 2755 2098 0.78 S7257 101.39 101.64 0.25 190 315 415 2865 1969 0.92 S7258 101.64 102.35 0.71 20 60 35 230 503 0.11 S7259 102.35 103.35 1.00 145 655 745 6935 3100 1.55 S7260 103.35 104.35 1.00 140 430 555 5665 3070 1.13 S7261 104.35 105.35 1.00 270 530 500 4575 2881 1.30 S7262 105.35 106.01 0.66 120 875 595 5180 2808 1.59 S7263 106.01 106.76 0.75 160 325 380 4000 2563 0.87 S7264 106.76 107.71 0.95 10 10 30 470 722 0.05 S7265 107.71 108.42 0.71 65 260 365 6170 1522 0.69 S7266 108.42 108.8 0.38 <10 <10 <10 235 355 S7277 108.8 109.8 1.00 25 60 105 1605 165 0.19 S7278 109.8 110.8 1.00 <10 <10 <10 175 210 This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings