Leighton Update

RNS Number : 6097Y
Global Petroleum Ltd
07 September 2009
 




7 September 2009

RNS AIM release


DRILLING COMMENCES ON FOURTH PRODUCTION WELL - LEIGHTON OIL AND GAS FIELD


Texon Petroleum Ltd (ASX: TXNhas advised that the fourth Leighton well, Tyler Ranch #3, commenced drilling on 5 September 2009. The well has a planned total depth of 2,743 metres (9,000 feet) and will take about 12-15 days to reach its target, which is the same oil and gas reservoir as in the first three Leighton wells (Peeler #1, Tyler Ranch #1 and Tyler Ranch #2).


Tyler Ranch #3 is located 420 metres south of Tyler Ranch #1.


Global has a 15% working interest (11.25% net revenue interest) in the Leighton Project with joint venture parties Texon Petroleum Limited (70%) and Excellong, Inc (15%).


Testing of the recently drilled Tyler Ranch #2 is planned for Wednesday, 9 September 2009. If the test is successful, the well will be placed on production as soon as testing has been concluded - probably by mid September.



Enquiries:


Global Petroleum Limited

Shane Cranswick

Tel

+ 61 8 9322 6322


Email

global.info@globalpetroleum.com.au

Astaire Securities Plc (Nominated Adviser and Broker)

William Vandyk

Tel

+44 20 7448 4400



This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQDLBBKKBLBBB
UK 100

Latest directors dealings