Drilling Report

Centamin Egypt Limited 2 July 2002 Centamin Egypt Limited 2nd July 2002 PROGRESS REPORT ON THE CURRENT DRILLING PROGRAM AT THE SUKARI GOLD PROJECT General Drilling to upgrade the present gold resource is well under way with all completed holes intersecting mineralisation. Assays and geology show that the mineralisation extends north into the RA zone with the additional drilling also proving up further measured, indicated and inferred resources in the AMUN zone. Metres drilled for the year to date total 8355m with an expected increase in the rate of drilling as the six rigs on site reach capacity. High Grade Hapi Zone. Following on from the discovery hole SDDH169 (14m @ 94g/t), this latest drilling has also intersected the HAPI zone. DDH213 with 28m @ 6.85g/t including 3m @ 56.83g/t extends the potential strike length of the Hapi zone to over 300m in length and still open to both north and south. DDH223 with 1m @36g/t is significant as the intersection is only 10m below the valley floor and is the probable extension of the Hapi zone towards the surface, which was expected. This will give access to this high-grade zone from the start of mining and will have an extremely positive impact on the project economics. New High Grade Zone DDH208 with 12m @ 11.99g/t including 2m @ 48.18g/t is a horizontal hole that was one of the initial holes into the RA zone. The mineralisation is high grade, close to the surface and down dip from surface mineralisation. DDH207 with 5m @ 3.51g/t which is 25m north of DDH208 is directly down dip from surface trenching samples which have an average of 6m @ 6.55g/t. Table of Significant Intersections Significant intersections encountered in the period since the March 2002 quarterly report are tabulated below: HOLE Northing Easting From (m) To (m) Interval (m) Grade Au g/t DDH205 10624 10606 237 244 7 2.75 DDH207 10650 10618 123 128 5 3.51 DDH208 10623 10425 66 78 12 11.99 incl 69 71 2 48.15 incl 76 77 1 16.10 DDH213 10704 10573 197 216 19 2.19 incl 202 213 11 3.39 incl 202 206 4 6.03 230 258 28 6.85 incl 236 239 3 56.83 RC221 10255 10427 57 110 53 2.36 incl 76 107 31 3.25 incl 93 103 10 5.59 incl 101 103 2 10.65 RC222 10203 10452 96 114 18 1.46 RC223 10175 10475 10 11 1 36.00 92 102 10 2.03 164 165 1 21.00 RC224 10141 10463 74 130 56 2.32 incl 110 124 14 4.95 110 112 2 11.60 RC225 10121 10444 71 79 8 2.19 100 111 11 4.63 incl 104 105 1 21.20 RC226 10100 10431 97 110 13 2.69 incl 108 110 2 7.92 RC231 10000 10499 71 75 3 3.37 RC237 9966 10480 75 81 6 3.13 RC238 10201 10343 7 8 3 3.81 RC244 10479 10415 26 41 15 2.6 incl 30 41 11 3.19 Resources The Company continues to focus on building its resource base and adding ounces to the 1.73M oz last calculated in September 01. A resource upgrade is expected to be carried out after a further 12 000m of diamond and RC drilling. The large rigs have been predominantly drilling reverse circulation (RC) drill holes with holes from 219 onwards all RC 'pre collar' holes, these are due to be continued (tailed) as diamond drill holes. _________________________________ Sami El-Raghy Managing Director This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings