Beowulf at UK Investor Show

RNS Number : 9964D
Beowulf Mining PLC
03 April 2014
 



3 April 2014

Beowulf Mining Plc

("Beowulf" or the "Company")

 

UK Investor Show

Beowulf (AIM: BEM; Aktietorget: BEO), the mineral exploration and development company principally focused on the group's Kallak North and Kallak South iron ore deposits in northern Sweden, announces that it will be attending and presenting at the UK Investor Show on Saturday 5 April 2014.

 

Beowulf's Chairman, Clive Sinclair-Poulton, will be delivering a presentation on the Company's flagship Kallak iron ore project - where fully funded drilling campaigns are underway on both the Kallak North and Kallak South deposits - as well as the group's ongoing drill campaign at its Ballek copper-gold JV project.

 

The Company will also be hosting an exhibition stand where Mr Sinclair-Poulton will be available to answer investors' questions.

 

The UK Investor Show will take place at the Queen Elizabeth II Conference Centre in Westminster, London, SW1P 3EE.

 

 

Enquiries:

 

Beowulf Mining Plc

 

Clive Sinclair-Poulton, Chairman

Tel: +353 (0)85 739 2674

 

 

Strand Hanson Limited

 

Matthew Chandler / Rory Murphy

Tel: +44 (0)20 7409 3494

 

 

Cantor Fitzgerald Europe

 

Stewart Dickson / Julian Erleigh / Jeremy Stephenson

Tel: +44 (0)20 7894 7000

 

 

Blytheweigh

 

Tim Blythe / Halimah Hussain / Eleanor Parry

Tel: +44 (0)20 7138 3204

 

 

or visit http://www.beowulfmining.net      

 

 

 

Notes to editors:

 

The Kallak Iron Ore Project

 

The Kallak iron ore project is located in the Jokkmokk municipality north of the Arctic Circle approximately 40km west of Jokkmokk city centre and approximately 80km southwest of the major iron ore mining centre of Malmberget in the Norrbotten County in northern Sweden.

 

Two iron ore deposits, Kallak North and Kallak South, are present, separated by only a few hundred metres in distance which may be connected at depth. Kallak North currently has an independent JORC Code compliant resource estimate of 88.8Mt Indicated Resources, grading at 27.7% Fe, and 55.3Mt Inferred Resources, grading at 28.2% Fe, modelled and reported by GeoVista AB in April 2013 at a 20% iron (Fe) cut-off and down to a vertical depth of 200m to 350m.

 

The currently ongoing Kallak South drill campaign is principally targeting a maiden JORC Code compliant resource estimate for the Kallak South deposit as well as seeking to determine whether the Kallak South and Kallak North deposits are geologically connected.

 

Ballek Copper-Gold JV Project

 

The Ballek project area in the Arjeplog municipality of the Västerbotten County in northern Sweden, comprises two exploration permits, Ballek nr2 and nr3, covering 13.59km2 and 4.69km2 respectively.

 

The project area contains the Lulepotten deposit on which a maiden JORC Code compliant Inferred Resource estimate was compiled and reported in September 2008 of 5.4Mt, grading at 0.8% Cu and 0.3g/t Au (cut-off value of 0.3% for copper). A number of further registered minor copper deposits are also known within the area.

 

The currently ongoing 3,000m drill programme is primarily seeking to test previously indicated copper targets at increased depths. In particular, it is targeting some pronounced deep lying Induced Polarisation (IP) targets located close to the previously identified copper-gold targets of Kvarnbäcken and Sågberget in the central parts of the project area.

 

 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
NRALXLFBZZFZBBQ
UK 100

Latest directors dealings