Gedabek Assay Results

Anglo Asian Mining PLC 02 June 2006 2 June 2006 ANGLO ASIAN MINING PLC ('Anglo Asian' or 'the Company') ENCOURAGING RESULTS AT GEDABEK Anglo Asian Mining PLC (AIM: AAZ) is pleased to announce that drilling at its Gedabek copper/gold prospect in Azerbaijan is progressing well and on plan. To date 19 diamond drill holes and 12 reverse circulation holes (RC) have been drilled on an 80 metre grid. The holes completed and available assays indicate the presence of significant copper and gold mineralisation at Gedabek. Assay results received to date are summarised in the table attached. A gold equivalent cut-off grade of 0.50 grams per tonne (g/t) was used to define the intervals. Gold equivalent conversion is based on a ratio of 1g/t gold to 60 g/t silver and 1% copper to 2.3g/t gold. The Company plans to complete further infill and boundary drilling to supplement the current 80 metre spacing. The current evaluation programme includes a further 22 drill-holes, making a total of 53 holes, and is expected to be complete by the end of August 2006. Completion of this drill programme and receipt of the assay data will allow Anglo Asian and their consultants SRK Consulting to develop a resource estimate for Gedabek. The Directors will continue to monitor the drilling results. When sufficient data becomes available to make a reliable assessment of the resource, a further announcement will be made. Ms. L Mach of SRK Consulting has reviewed and approved the information contained in this press release for the purposes of Part Two of the 'Guidance Note for Mining, Oil and Gas Companies' dated March 2006 issued by the London Stock Exchange. Ms. Mach is a Certified Professional Geologist (American Institute of Professional Geologists) and is considered a Qualified Person within the meaning of NI 43-101 and JORC. SRK Consulting is an international minerals consultancy group, independent of Anglo Asian. Ends- For further details, please contact: Anglo Asian Mining PLC Graham Mascall, Chairman +44 20 7409 3232 Charles Hancock, Chief Executive +44 20 7409 3232 Richard Round, Finance Director +44 20 7409 3232 Numis Securities Limited John Harrison +44 20 7776 1590 Parkgreen Communications Victoria Thomas +44 20 7493 3713 Notes: 1. All holes are drilled vertically and reported intervals are drill-hole lengths; true widths of mineralization intercepts have not yet been calculated. 2. The diamond drill cores are predominately HQ-sized (63.5mm diameter), with some holes reduced to NQ (47.6mm diameter). The RC holes GDRC01a to GDRC07a are 115mm in diameter. 3. The core is split on-site and one half is shipped to OMAC Laboratories Ltd in Loughrea, Ireland. RC chips are reduced to a nominal 2 kilogram sample on-site and also sent to OMAC. Gold is analysed by fire assay (30 gram) with atomic absorption finish. Copper and silver are analysed with a 46 element ICP procedure. A laboratory quality assurance/quality control programme is in place with blanks and duplicate samples inserted into the sample stream. External check assays will be done at ALS Chemex in Vancouver, British Columbia, Canada. Table of Assay Results from Gedabek Drilling Programme Hole No. Type TD (m) From (m) To (m) Interval Au Eq (g/t) Au (g/t) Ag (g/t) Cu (%) (m) _______________________________________________________________________________________________________ GDDD01 Core 110.2 32.0 95.0 63.0 5.33 4.49 25.07 0.19 with 34.0 51.0 17.0 17.34 with 61.0 86.0 25.0 0.28 _______________________________________________________________________________________________________ GDDD02 Core 125.0 0.0 7.0 7.0 0.60 0.15 1.51 0.19 and 32.0 52.0 20.0 0.66 0.04 0.47 0.27 _______________________________________________________________________________________________________ GDDD03 Core 140.0 0.0 22.0 22.0 1.95 1.04 6.50 0.35 with 0.0 6.0 6.0 3.36 and 30.0 34.0 4.0 1.19 0.51 15.21 0.19 and 58.0 70.0 12.0 0.77 0.08 1.26 0.29 and 80.0 118.0 38.0 0.92 0.04 0.45 0.38 _______________________________________________________________________________________________________ GDDD04 Core 100.0 6.0 44.0 38.0 3.61 2.20 11.47 0.53 and 54.0 66.0 12.0 2.58 2.03 5.82 0.20 _______________________________________________________________________________________________________ GDDD05 Core 165.0 38.0 52.0 14.0 1.25 0.45 12.92 0.26 and 56.0 76.0 20.0 1.15 0.60 3.16 0.22 _______________________________________________________________________________________________________ GDDD06 Core 200.0 0.0 10.0 10.0 1.17 0.65 8.63 0.16 and 14.0 24.0 10.0 1.67 1.35 2.40 0.12 and 70.0 76.0 6.0 0.75 0.22 0.47 0.23 _______________________________________________________________________________________________________ GDDD07 Core 175.0 36.0 81.0 45.0 3.06 2.25 19.54 0.21 _______________________________________________________________________________________________________ GDDD08 Core 225.0 98.0 118.0 20.0 4.00 2.27 21.02 0.60 _______________________________________________________________________________________________________ GDDD09 Core 191.0 14.0 70.0 56.0 1.42 0.67 5.67 0.28 _______________________________________________________________________________________________________ GDDD10 Core 180.0 0.0 43.4 43.4 3.26 2.31 27.08 0.22 and 43.4 44.4 1.0 Void and 44.4 74.0 29.6 1.29 0.64 6.40 0.24 and 94.0 100.0 6.0 0.63 0.04 0.25 0.25 and 104.0 114.0 10.0 2.03 1.86 3.98 0.05 _______________________________________________________________________________________________________ GDDD11 Core 253.0 120.0 142.0 22.0 3.20 1.39 16.21 0.67 _______________________________________________________________________________________________________ GDDD12 Core 220.0 42.0 50.0 8.0 11.11 9.30 64.43 0.32 and 50.0 54.8 4.8 Void and 54.8 83.0 28.2 2.89 1.02 7.28 0.76 and 93.0 109.0 16.0 1.02 0.81 1.87 0.08 and 117.0 125.0 8.0 1.27 1.16 2.81 0.03 _______________________________________________________________________________________________________ GDDD13 Core 244.0 44.0 56.0 12.0 2.65 1.03 8.92 0.64 and 64.0 106.0 42.0 0.95 0.54 4.07 0.15 with 64.0 68.0 4.0 2.24 18.15 _______________________________________________________________________________________________________ GDRC01a RC 125.0 2.0 48.0 46.0 3.50 2.24 10.35 0.47 with 14.0 31.0 17.0 5.02 19.89 with 22.0 33.0 11.0 1.22 and 57.0 76.0 19.0 3.73 3.53 2.45 0.07 with 73.0 75.0 2.0 29.76 7.92 and 84.0 91.0 7.0 1.97 1.67 4.87 0.09 and 94.0 123.0 29.0 3.03 2.37 7.62 0.23 _______________________________________________________________________________________________________ GDRC02a RC 103.0 12.0 78.0 66.0 1.70 0.92 11.21 0.26 with 53.0 60.0 7.0 1.31 _______________________________________________________________________________________________________ GDRC03 RC 148.0 23.0 60.0 37.0 4.51 3.67 35.58 0.11 with 25.0 39.0 14.0 8.10 73.01 and 64.0 97.0 33.0 1.07 0.12 0.86 0.41 _______________________________________________________________________________________________________ GDRC04a RC 88.0 78.0 84.0 6.0 1.39 0.16 6.50 0.49 _______________________________________________________________________________________________________ GDRC05 RC 147.0 18.0 51.0 33.0 4.74 3.20 27.89 0.47 with 21.0 31.0 10.0 8.85 74.16 and 54.0 59.0 5.0 2.95 0.12 1.55 1.22 _______________________________________________________________________________________________________ GDRC06 RC 66.0 20.0 47.0 27.0 9.69 6.70 72.06 0.78 and 52.0 61.0 9.0 2.89 2.05 33.28 0.12 _______________________________________________________________________________________________________ GDRC07a RC 72.0 26.0 40.0 14.0 1.74 1.69 1.22 0.02 and 43.0 62.0 19.0 3.62 2.69 22.30 0.24 _______________________________________________________________________________________________________ This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings