Financial Express (Holdings) Limited (“we”, “our”, “us” and derivatives) are committed to protecting and respecting your privacy. This Privacy Policy, together with our Terms of Use, sets out the basis on which any personal data that we collect from you, or that you provide to us, will be processed by us relating to your use of any of the below websites (“sites”).


For the purposes of the Data Protection Act 1998, the data controller is Trustnet Limited of 2nd Floor, Golden House, 30 Great Pulteney Street, London, W1F 9NN. Our nominated representative for the purpose of this Act is Kirsty Witter.


We collect information about you when you register with us or use any of our websites / services. Part of the registration process may include entering personal details & details of your investments.

We may collect information about your computer, including where available your operating system, browser version, domain name and IP address and details of the website that you came from, in order to improve this site.

You confirm that all information you supply is accurate.


In order to provide personalised services to and analyse site traffic, we may use a cookie file which is stored on your browser or the hard drive of your computer. Some of the cookies we use are essential for the sites to operate and may be used to deliver you different content, depending on the type of investor you are.

You can block cookies by activating the setting on your browser which allows you to refuse the setting of all or some cookies. However, if you use your browser settings to block all cookies (including essential cookies) you may not be able to access all or part of our sites. Unless you have adjusted your browser setting so that it will refuse cookies, our system will issue cookies as soon as you visit our sites.


We store and use information you provide as follows:

  • to present content effectively;
  • to provide you with information, products or services that you request from us or which may interest you, tailored to your specific interests, where you have consented to be contacted for such purposes;
  • to carry out our obligations arising from any contracts between you and us;
  • to enable you to participate in interactive features of our service, when you choose to do so;
  • to notify you about changes to our service;
  • to improve our content by tracking group information that describes the habits, usage, patterns and demographics of our customers.

We may also send you emails to provide information and keep you up to date with developments on our sites. It is our policy to have instructions on how to unsubscribe so that you will not receive any future e-mails. You can change your e-mail address at any time.

In order to provide support on the usage of our tools, our support team need access to all information provided in relation to the tool.

We will not disclose your name, email address or postal address or any data that could identify you to any third party without first receiving your permission.

However, you agree that we may disclose to any regulatory authority to which we are subject and to any investment exchange on which we may deal or to its related clearing house (or to investigators, inspectors or agents appointed by them), or to any person empowered to require such information by or under any legal enactment, any information they may request or require relating to you, or if relevant, any of your clients.

You agree that we may pass on information obtained under Money Laundering legislation as we consider necessary to comply with reporting requirements under such legislation.


We want to ensure that the personal information we hold about you is accurate and up to date. You may ask us to correct or remove information that is inaccurate.

You have the right under data protection legislation to access information held about you. If you wish to receive a copy of any personal information we hold, please write to us at 3rd Floor, Hollywood House, Church Street East, Woking, GU21 6HJ. Any access request may be subject to a fee of £10 to meet our costs in providing you with details of the information we hold about you.


The data that we collect from you may be transferred to, and stored at, a destination outside the European Economic Area (“EEA”). It may be processed by staff operating outside the EEA who work for us or for one of our suppliers. Such staff may be engaged in, amongst other things, the provision of support services. By submitting your personal data, you agree to this transfer, storing and processing. We will take all steps reasonably necessary, including the use of encryption, to ensure that your data is treated securely and in accordance with this privacy policy.

Unfortunately, the transmission of information via the internet is not completely secure. Although we will do our best to protect your personal data, we cannot guarantee the security of your data transmitted to our sites; any transmission is at your own risk. You will not hold us responsible for any breach of security unless we have been negligent or in wilful default.


Any changes we make to our privacy policy in the future will be posted on this page and, where appropriate, notified to you by e-mail.


Our sites contain links to other websites. If you follow a link to any of these websites, please note that these websites have their own privacy policies and that we do not accept any responsibility or liability for these policies. Please check these policies before you submit any personal data to these websites.


If you want more information or have any questions or comments relating to our privacy policy please email [email protected] in the first instance.

 Information  X 
Enter a valid email address

Sirius Minerals plc (SXX)

  Print      Mail a friend       Annual reports

Friday 12 January, 2018

Sirius Minerals plc

Quarterly progress update

RNS Number : 6777B
Sirius Minerals plc
12 January 2018


12 January 2018


Sirius Minerals Plc

Quarterly progress update

§ The project remains on track to deliver first polyhalite and commercial production on time and on budget

§ Wilmar offtake agreement signed

§ D-walling progress slightly behind schedule

§ Review of 2017 milestones demonstrates good progress


Sirius Minerals Plc ("Sirius" or the "Company") provides its latest quarterly progress update.


The project recorded one lost time incident during the period.  As the organisation expands the Company is proactively engaging with all staff and construction partners to communicate its safety culture and Company values.

Cost and schedule

The project remains on track to deliver first polyhalite and commercial production on time and on budget.  Current diaphragm walling ("D-walling") activities are approximately two months behind schedule following some delays in commissioning the D-walling equipment and some adverse weather conditions during the latter stages of the quarter.  The Company is confident that this small loss of time will be recovered over the remainder of the project schedule.


The conditions clearing process continues to function smoothly with all relevant conditions satisfied for the ongoing scopes of works at all locations. 

The application for 'minor material' amendments to the original planning application was unanimously approved by the local planning authority.  This approval covered the previously highlighted changes to the foreshaft and surface layout designs at the Woodsmith site.    

Site preparation

The site preparation scope of work at the Woodsmith and Lockwood Beck sites is substantially complete.  A number of minor activities remain ongoing and will be completed in 2018.  At Wilton, site clearance and the removal of vegetation is underway to enable construction activities to commence.

Geotechnical investigation

The production shaft geotechnical borehole, SM14B, is nearing the polyhalite horizon with drilling and testing complete to 1,329m.  Geotechnical and hydrogeological work continues to support and refine parameters used in the shaft design and construction methodology.

The mineral transport system ("MTS") seismic survey is nearing completion and continues to provide excellent quality data to support engineering activities.  MTS drilling is ongoing with the majority of the scope completed.  Over 2,500m of core has been recovered, logged and sub-sampled to confirm the geotechnical parameters required for detailed MTS design.  Current activities are focussed on the Wilton Portal and the MTS caverns at Lockwood Beck.

Shaft sinking

D-walling activities are progressing smoothly with three rigs operating on the services shaft.  Six panels are in progress or have been completed with a total of 48 panels required to complete the foreshaft for the services shaft.  The D-walling scope of work is approximately two months behind schedule due to delays in commissioning and adverse weather conditions across the quarter.  The Company is confident of recovering the lost time over the remainder of the project schedule.

Once D-walling activities are completed, excavation and fit-out of the foreshafts and surface basements will commence.  Preparation for these activities is progressing well, including contractor procurement and engineering.

The Company is still working to finalise the shaft sinking contract.  This activity is the key focus of management's attention and all avenues are being explored to ensure a shaft sinking contract will be executed as soon as possible and the impact on the overall construction programme is minimized. 

Other project activities

Procurement activities for the MTS are well advanced with a view to commencing initial construction activities in 2018.  The Company is working closely with a number of parties in relation to the commercial terms associated with the tunnelling scope of work.    

Front end engineering and design work for the port and materials handling facility ("MHF") is now underway and Sirius is engaged with a number of potential delivery partners.  The Company is also pursuing port outsourcing opportunities with potential partners and this process is progressing well. 

Commercial activities across all scopes of work are scheduled to be substantially complete by the middle of 2018 in order to facilitate the completion of the stage 2 financing process.   

Agronomy, sales and marketing

During the quarter, the Company announced the signing of a binding take-or-pay offtake agreement with Wilmar International for the use and resale of POLY4 exclusively in South East Asia.  Wilmar is a leading global agribusiness with the capacity to reach a diverse customer base through well-established, trusted relationships.

The Company is continuing negotiations with a variety of potential customers in multiple regions to expand its commercial reach into new markets.  POLY4 continues to gain market acceptance globally from both industry participants and experts.

The Company has initiated 28 new agronomy trials.  The overall programme now encompasses over 260 trials on 32 crops in 17 different countries.


Activities relating to the stage 2 financing process will gather momentum as the coming year unfolds.  The Company is intending to re-engage with the bank group during the first quarter by issuing a comprehensive due diligence information package.  This is the first major milestone in the timetable which is aiming to have commitments in place during the second half of 2018.     


Performance against milestones for 2017

The Company set out key milestones for 2017 at the beginning of that year.  Performance against these milestones is summarised below. 

Complete site preparation works at Woodsmith Mine and Lockwood Beck

Status: Complete

•     Site access works complete.

•     Haul road, drainage, concrete batch plant and general infrastructure complete.

•     Site welfare facilities installed and operational.

•     MTS and reinjection pads complete.


Substantially complete D-wall installation for production and service shafts

Status:  Partially complete - approximately two months behind schedule

•     Scope of D-walling activities was substantially increased with the change to wider foreshafts.

•     Progress on production shaft has been deferred to allow for the SM14B drilling programme.

•     Delay is estimated by comparing progress against like for like scope (total m2 of panels).


Progress design activities for MTS and front-end design for harbour and MHF

Status: Complete

•     MTS scope of work at advanced commercial discussion stage with multiple contractors.

•     Design scope for MHF and overland conveyor complete and out for commercial tender.

•     Port outsourcing opportunities are being negotiated in parallel with internal design and build process.


Execute incremental offtake agreements

Status: Partially complete

•     Offtake agreement signed with Wilmar International for South East Asia.  Seven years, peaking at 0.75 million tonnes per annum.

•     Commercial discussions for other key regions (Europe, Brazil, China, Africa) progressing well.

•     On track for stage 2 financing requirements.


Expand breadth and depth of the agronomy programme

Status: Complete

•     260 trials on 32 crops in 17 countries.

•     Over 60 new trials commenced during the period.


Seek a Premium Listing and move to the Main Board

Status: Complete

•     Premium Listing obtained in Q2.

•     FTSE 250 inclusion obtained at half year index re-weighting.

•     2017 total shareholder return of 24% vs 14% for the FTSE 250.


Preparation work for stage 2 financing execution in late 2018

Status: Complete

•     Key advisors appointed and due diligence programme well advanced.

•     In principle agreement reached with IPA in relation to structure and financing process.



For further information, please contact:

Sirius Minerals Plc

Investor Relations Manager

Tristan Pottas

Email: [email protected]

Tel: +44 845 524 0247

Media enquiries


Jos Simson


Tel: +44 20 7920 3150


About Sirius Minerals Plc

Sirius Minerals Plc is focused on the development of the Woodsmith Mine, which will access the world's largest and highest grade polyhalite deposit located in North Yorkshire, United Kingdom.  Polyhalite is a unique multi-nutrient fertilizer, which can be used to increase balanced fertilization around the world.  Sirius Minerals' shares are traded on the Premium List of the London Stock Exchange.  Its shares are also traded in the United States on the OTCQX through a sponsored ADR facility.  Further information on the Company can be found at: