Red Setter Gold Dome Project Exploration Update

Summary by AI BETAClose X

Wishbone Gold PLC announced an exploration update for its Red Setter Gold Dome Project. Diamond drilling on hole 2 was completed at 950m, revealing multiple zones of fracturing with pyrite, and the core will be sent for assay. Drilling has commenced on hole 3, targeting an area where previous drilling intercepted 7m @ 2g/t gold and 0.38 copper from 273m. A Reverse Circulation drill rig has been contracted for an initial 5,000m of drilling and will mobilize to the site to complement the existing diamond drill rig, targeting shallower copper gold intercepts from 117m reported in drilling from 2023.

Disclaimer*

UK 100

Latest directors dealings