High-Grade Intercepts incl 8.75m at 5.05 g/t Au

Summary by AI BETAClose X

Talon Resources PLC has announced preliminary assay results from its maiden drill programme at the Eagle Lake Gold Project, revealing high-grade gold mineralisation. Notably, hole EG-26-07 at Cedar Trench intersected 21.25 metres at 2.19 g/t Au, including a significant 8.75 metres at 5.05 g/t Au, with even higher grades of 0.93m at 15.10 g/t Au and 1.25m at 17.08 g/t Au within that interval. Other intercepts include 11.57m at 0.85 g/t Au in the same hole and 33.35m at 0.61 g/t Au in EG-26-06. These encouraging results, which are still preliminary for some samples, reinforce the prospectivity of the project and are expected to guide future exploration efforts.

Disclaimer*

UK 100

Latest directors dealings