Update on production at Triton FPSO

Summary by AI BETAClose X

Serica Energy PLC announced that production has resumed at the Triton FPSO following a temporary suspension due to a flare system issue announced on October 8, 2025. Production has been ramped up by the operator and has now reached a rate of over 25,000 boepd net to Serica. The company had expected to resume production at a limited level shortly after the initial announcement.

Disclaimer*

UK 100

Latest directors dealings