Serica Energy PLC announced a temporary suspension of production from September 30th due to an issue with the flare system on the Dana Petroleum operated Triton FPSO. Production is expected to restart shortly but will be severely limited until the problem is resolved. Consequently, Serica anticipates production to fall below the previously communicated guidance range of 29,000 to 32,000 boepd. This follows a vibration issue within the compression trains on the Triton FPSO, which led to work being completed on the A compressor on September 23rd, briefly achieving production of 25,000 boepd net to Serica. The company is in talks with the operator to improve the future performance of the Triton FPSO.