MOU-6 preliminary well testing update

Summary by AI BETAClose X

Predator Oil & Gas Holdings Plc has provided an update on the preliminary well testing of MOU-6, reporting successful perforation from 825.7 to 845.5 metres. However, the well encountered combined low permeability and low gas saturations, resulting in no inflow of gas and only diesel and brine recovery. While the company is disappointed with the results, the acquired data will enrich its database for studying prospective unconventional gas potential, with further analysis planned to investigate the well performance. The MOU-6 well has been suspended for potential deepening, and shallow gas shows up to 2.69% have been sampled.

Disclaimer*

UK 100

Latest directors dealings