Drilling locations identified for Fort Dodge

Summary by AI BETAClose X

Mendell Helium PLC has identified five prospective production well locations for its 2026 Fort Dodge drilling programme following seismic data analysis, with a preferred drilling contractor selected. The company is progressing land access and drilling permits, and the campaign is fully funded by a capital raise in April 2026. Rixford Resources LLP has expressed interest in co-funding additional wells, potentially expanding the programme beyond the initial four. Operational savings are anticipated through bulk purchasing and streamlined logistics. Updates on existing projects include finalising low-cost frack plans for Rost 2-26, pending de-watering progress, and commencing water pumping for the Schneweis Ventures 13A well.

Disclaimer*

UK 100

Latest directors dealings