TECHNICAL REPORT FILED ON SEDAR+ FOR UPDATED PEA

Summary by AI BETAClose X

Cornish Metals Inc. has filed a technical report for its South Crofty tin project, summarizing the updated Preliminary Economic Assessment (PEA). The project boasts a solid after-tax NPV6% Real of £180 million and a 20% IRR, based on a tin price of US$33,900 per tonne. The pre-tax NPV6% Real is £237 million with a 23% IRR, and the capital payback period is 3.3 years after-tax after production begins. The project anticipates cumulative after-tax cash flow of approximately £558 million from the start of production, with average annual after-tax cash flow of about £57 million in years two through six and average annual EBITDA of £70 million with a 62% margin during the same period. Average annual tin production is projected at approximately 4,700 tonnes for years two through six, with average AISC of approximately US$13,420 per tonne of payable tin.