Vedanta Res PLC

Vedanta Resources Q2 FY19 Production Release

RNS Number : 9160D
Vedanta Resources PLC
12 October 2018
 

 

Vedanta Resources plc

16 Berkeley Street

London W1J 8DZ

Tel: +44 (0) 20 7499 5900

Fax: +44 (0) 20 7491 8440

www.vedantaresources.com 

 

 

        

 

 

 

 12 October 2018

Vedanta Resources Plc

Production Release for the Second Quarter and Half Year

ended 30th September 2018

 

Highlights

 

Operations

 

Zinc India:

·    Mined metal production at 232kt, up 6% y-o-y; Underground production up 44% y-o-y 

·    Refined lead metal production at 49kt, up 30% y-o-y

·    Record refined silver production at 5.5 mn ounces, up 23% y-o-y

 

Zinc International:

·    Trial production of concentrate at Gamsberg has commenced in end September

·   Total production for Q2 FY2019 was 28kt, lower by 34% y-o-y due to lower than planned zinc grades at Skorpion and planned prioritisation of mine development at BMM

 

Oil & Gas:

·    Average gross production of 186 kboepd for Q2 FY2019, up 3% y-o-y

·    7 development drilling rigs in Rajasthan; 32 wells drilled till date

 

Iron ore:

·    Goa operations remain suspended due to statewide directive from the Supreme Court; continue to engage with the Government for resumption of mining operations

·    Production of saleable ore at Karantaka at 1.4 million tonnes, up 56% y-o-y

·    Production of Pig Iron at 173kt, up 26% y-o-y

 

Steel:

·    Steel production at 285kt for Q2 FY2019, up 16% y-o-y

·    Exited Q2 FY2019 at a monthly run rate of 1.3 mtpa

Copper India:

·    Review by the independent committee of the National Green Tribunal in progress

Copper Zambia:

·    Mined metal production at 25kt, up 4% y-o-y and up 9% q-o-q

·    Custom production at 25kt, down 20% y-o-y and up 21% q-o-q

 

Aluminium:

·    Record quarterly aluminium production at 494kt, up 23% y-o-y

·    Alumina production from Lanjigarh refinery at 348kt, up 30% y-o-y

 

Power:

·    1,980 MW TSPL plant achieved availability of 94% in Q2 FY2019

 

Corporate

 

·   On 31st July 2018, Volcan Investments ("Volcan") and Vedanta Resources announced that they had reached agreement on the terms of a recommended cash offer by Volcan for the remaining issued and to be issued share capital of Vedanta Resources not currently owned by Volcan (the "Offer")

·  The Offer was made on 3rd August 2018 and further to the announcement by Volcan on 3rd September 2018 that the Offer has become unconditional in all respects, the listing of Vedanta Shares on the Official List of the UK Listing Authority and the trading of Vedanta Shares on the main market for listed securities of the London Stock Exchange was cancelled with effect from 2nd October 2018 

Zinc India

 

Particulars (in'000 tonnes, or as stated)

Q2

Q1

Half Year

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

FY 2018

% Change YoY

ZINC INDIA

 

 

 

 

 

 

 

 

Mined metal content

232

219

6%

212

10%

444

452

(2)%

Integrated metal

212

230

(8)%

214

(1%)

425

459

(7%)

Refined Zinc - Integrated

162

192

(16)%

172

(5)%

334

386

(13)%

Refined Lead -     Integrated1

49

38

30%

42

17%

91

73

25%

 Silver- Integrated (in mn ounces)2

5.5

4.5

23%

4.4

25%

10.0

8.2

22%

 

Q2 FY2019 vs. Previous Quarters

 

Mined metal production from underground mines was at an all-time high of 232,000 tonnes, up 44% y-o-y and 10% q-o-q driven by 33% y-o-y increase in ore production. Total mined metal production increased by 6% y-o-y and 10% q-o-q after the closure of open-cast operations last year.

 

Integrated metal production was 212,000 tonnes, down 8% y-o-y and flat q-o-q . Integrated zinc production was down 16% y-o-y and 5% q-o-q  to 162,000 tonnes due to temporary mismatch in zinc mined metal availability even as mine production ramped up towards the latter half of the quarter. Integrated lead production jumped by 30% y-o-y and 17% q-o-q to 49,000 tonnes. The pyro metallurgical smelter was retrofitted to produce more lead metal, considering the higher availability of lead mined metal, leading to higher lead production. Integrated silver production was a record 5.5 mn ounces, up 23% y-o-y and 25% q-o-q on account of higher lead production and higher Sindesar Khurd mine production and better silver grades.

 

Projects Update

·   Capital mine development remained unchanged y-o-y at 9.8 km during the quarter and increased by 9% to 20.2 km in H1 FY2019.

·    Rampura Agucha underground mine continued to maintain a high total development rate at 5.3 km during the quarter. The mined metal production increased by 94% y-o-y and 35% q-o-q to 96,000 tonnes. Mid shaft loading system was commissioned at the end of quarter, allowing waste hoisting to be done through shaft ahead of schedule. This will help to improve volumes until the off shaft is fully commissioned. Off shaft development is on track and commercial production from main shaft is expected to start from Q4 FY2019.

·    Sindesar Khurd mine achieved 5.2 km total development during the quarter. The production shaft work is progressing well with winders commissioned in manual mode and material hoisting from shaft is expected to start in Q3 FY2019. The new 1.5 mtpa mill is expected to be commissioned in Q3 FY2019.

·   At Zawar, civil and erection works of the new 2 mtpa mill is on track and expected to commission by Q4 FY2019. The fumer project at Chanderiya is expected to commission in Q3 FY2019.

·    Planning for the next phase of expansion from 1.2 to 1.35 mtpa mined metal capacity announced in April 2018 is underway

H1 FY2019 vs. H1 FY2018

 

Mined metal production from underground mines for H1 FY2019 was 444,000 tonnes, 27% higher from a year ago even as the closure of open-cast operations caused total mined metal production to decline by 2% y-o-y.

 

Integrated metal production was 425,000 tonnes, down 7%. Integrated lead and silver production were at 91,000 tonnes and 10.0 mn ounces, higher y-o-y by 25% and 22% respectively driven by higher lead mined metal production and better silver grades. Integrated zinc production was lower y-o-y by 13% in line with the availability of zinc mined metal.

 

Zinc - International

 

Particulars (in'000 tonnes, or as stated)

Q2

Q1

Half Year

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

FY 2018

% Change YoY

ZINC INTERNATIONAL

28

42

(34)%

25

11%

54

74

(28)%

  Zinc -refined -Skorpion

15

23

(35)%

10

42%

25

36

(31)%

  Mined metal content - BMM

13

20

(32)%

15

(11)%

29

38

(25)%

 

Q2 FY2019 vs. Previous Quarters

 

Total production for Q2 FY2019 was 28,000 tonnes, lower by 34% y-o-y and higher by 11% q-o-q.

 

Production at Skorpion during the quarter was 15,000 tonnes, 35% lower y-o-y due to lower than planned zinc grades and hence lower recoveries and 42% higher q-o-q due to annual shutdown in Q1 FY 2019. Production in H2 FY2019 is forecasted to increase due to higher planned ore grade and fully ramped up ore production from Pit 112. The pre-stripping of Pit 112 continues in the second year of the project. Over 65% of waste pre-stripping has been completed with full completion expected by Q4 FY2019.

 

Production at BMM was 13,000 tonnes, 32% lower y-o-y and 11% lower q-o-q. This was due to planned prioritisation of mine development in H1 FY2019 to provide for flexibility for ore mining and blending in H2 FY2019.

 

At Gamsberg, 100% of pre-stripping with 68 million tonnes of waste excavation has been completed in July 2018, as per the plan. 750,000 tonnes of ore stockpile has been built ahead of the plant feed. The crusher has been fully commissioned and enough crushed ore stockpile has been built. The milling area (sag mills/ball mills), water and power infrastructure and the tailings storage facility have been fully commissioned. First ore was fed through the concentrator plant in September 2018 and the trial concentrate production has commenced in end September post commissioning of floatation.  The operations team has already been fully mobilised. We now expect the ramp up to full mill capacity in 9-12 months.

 

H1 FY2019 vs. H1 FY2018

 

During H1 FY2019, total production was at 54,000 tonnes, lower by 28% y-o-y on account of a planned shutdown of the acid plant at Skorpion during Q1 FY2019 and due to lower than planned zinc grades and hence lower recoveries at both Skorpion and BMM. With the fully ramped up Skorpion mine, feed to refinery will be maximised and the grade is expected to be higher than 8% against H1 FY2019 grade of ~6%.

 

Oil & Gas

 

Particulars

Q2

Q1

Half Year

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

FY 2018

% Change YoY

OIL AND GAS

 

 

 

 

 

 

 

 

Average Daily Gross Operated Production (boepd)

185,926

180,955

3%

194,986

(5)%

190,431

184,062

3%

   Rajasthan

155,194

153,238

1%

164,040

(5)%

159,593

156,278

2%

   Ravva

13,496

17,266

(22)%

14,217

(5)%

13,855

17,810

(22)%

   Cambay

17,236

10,452

65%

16,729

3%

16,984

9,974

70%

Average Daily Working Interest Production (boepd)

118,748

115,332

3%

124,807

(5)%

121,761

117,391

4%

   Rajasthan

108,636

107,267

1%

114,828

(5)%

111,715

109,395

2%

   Ravva

3,037

3,885

(22)%

3,199

(5)%

3,117

4,007

(22)%

   Cambay

6,894

4,181

65%

6,692

3%

6,794

3,990

70%

   KG-ONN

181

-

-

89

-

135

-

-

Total Oil and Gas (million boe)

 

 

 

 

 

 

 

 

   Oil & Gas- Gross

17.1

16.6

3%

17.7

(4)%

34.8

33.7

3%

   Oil & Gas-Working Interest

10.9

10.6

3%

11.4

(4)%

22.3

21.5

4%

 

Q2 FY2019 vs. Previous Quarters

 

Average gross operated production during Q2 FY2019 across our assets was 185,926 barrels of oil equivalent per day (boepd), up 3% y-o-y. The increase in volume was primarily due to the infill wells in Mangala and Cambay, new wells brought online as part of Bhagyam and Aishwariya EOR campaign and production optimization activities carried out across assets.

 

Average gross operated production was lower 5% q-o-q mainly due to the natural field decline. Efforts well advanced to off-set this impact. All our assets recorded an uptime of over 99%.

 

Gross production from the Rajasthan block averaged 155,194 boepd for the quarter, 1% higher y-o-y and 5% lower q-o-q. 32 wells have been drilled as part of the growth projects and 8 wells have been brought online. Gross production from Development Area-1 (DA-1), Development Area-2 (DA-2) and Development Area-3 (DA-3) averaged 136,658 boepd, 17,922 boepd and 614 boepd respectively.

 

Gas production from Raageshwari Deep Gas (RDG) averaged 47.1 million standard cubic feet per day (mmscfd) in Q2 FY2019, with gas sales, post captive consumption, at 29.6 mmscfd.

 

The Ravva block produced at an average rate of 13,496 boepd for the quarter, lower by 22% y-o-y and 5% q-o-q primarily due to the natural field decline.

 

The Cambay block produced at  an average rate of 17,236 boepd for the quarter, up by 65% y-o-y and 3% q-o-q supported by the gains realized from infill wells campaign completed in Q1 FY2019.

 

Key upcoming project milestones

·    MBA Infill, EOR Polymer and ASP Project: 29 wells have been drilled till date. Of these 8 wells are already online, 26+ wells will be online by Q3 FY2019 and 50+ wells online by Q4 FY2019. ASP surface facilities activities contract to be awarded by Q3 FY2019.

·    Gas production to increase substantially during the year:

o GIGL pipeline nearing completion. Facility debottlenecking shall enable increase in gas volumes by Q3 FY2019

o Early gas production facility shall double the gas production by Q4 FY2019

o Tight Gas (RDG): 1 well drilled. Hydraulic fracturing activity commenced in existing wells.

·    Liquid handling facility upgradation progressing as per plan to handle incremental volume.

·    Tight Oil Appraisal fields: The appraisal for 4 tight oil fields to commence in Q3 FY2019.

Exploration

·    KG Offshore: The first Exploration well has been drilled and tested with flow of gas. A new hydrocarbon discovery has been declared. The drilling of the second exploration well is scheduled for drilling in Q4 FY 2019.

·    RJ Exploration: 7-18 exploration and appraisal wells drilling campaign to start in Q3 FY2019 to build on the resource portfolio.

 

H1 FY2019 vs. H1 FY2018

 

Average gross production across our assets was 3% higher y-o-y at 190,431 boepd. Production from Rajasthan block was 159,593 boepd, 2% higher y-o-y resulting from the gains of the Mangala infill campaign and prudent reservoir management practices. Production from the offshore assets, was at a combined 30,838 boepd, higher by 11% y-o-y, due to the gains from Cambay infill campaign partially offset by the natural field decline.

 

Iron Ore

 

Particulars (in million dry metric tonnes, or as stated)

Q2

Q1

Half Year

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

FY 2018

% Change YoY

IRON ORE

 

 

 

 

 

 

 

 

Sales

0.4

0.7

(51)%

1.4

(74)%

1.8

3.0

(41)%

     Goa

0.1

0.1

(14)%

1.0

(89)%

1.2

2.0

(42)%

     Karnataka

0.2

0.6

(59)%

0.4

(31)%

0.6

1.0

(41)%

Production of Saleable Ore

1.4

1.2

16%

1.4

(1)%

2.8

4.5

(38)%

     Goa

-

0.4

-

0.2

-

0.2

2.6

(91)%

     Karnataka

1.4

0.9

56%

1.2

19%

2.6

1.9

36%

Production ('000 tonnes)

 

 

 

 

 

 

 

 

     Pig Iron

173

137

26%

167

4%

339

300

13%

 

Q2 FY2019 vs. Previous Quarters

 

There was no production at Goa due to suspension of mining pursuant to the Hon'ble Supreme Court judgement dated 7 February 2018 directing mining operations of all companies in Goa to stop with effect from 16 March 2018. We continue to engage with the Government for resumption of mining operations.

 

At Karnataka, production was 1.4 million tonnes, 56% higher y-o-y and 19% higher q-o-q. Sales were at 0.2 million tonnes due to muted e-auction sales.

 

Pig iron production was at 173,000 tonnes, 26% higher y-o-y and 4% higher q-o-q.

H1 FY2019 vs. H1 FY2018

 

At Karnataka, production was higher y-o-y at 2.6 million tonnes due to an increase in mining cap from 2.3 MT to 4.5 MT. Sales were lower y-o-y at 0.6 million tonnes due to muted e-auction sales. Production of Pig Iron increased to 339,000 tonnes in H1 FY2019, 13% higher mainly due to lower metallurgical coke availability on account of weather related supply disruptions in Australia in Q1 FY2018 and local contractors' strike in Q2 FY2018.

 

Steel

 

Particulars (in'000 tonnes, or as stated)

Q2

Q1

Half Year

 FY 2019

FY 2018

% Change YoY

FY 2019 (June)

FY 2019

% Change QoQ

 FY 2019

FY

2018

% Change YoY

STEEL3

 

 

 

 

 

 

 

 

 

Production

285

247

16%

71

242

18%

527

485

9%

  Pig Iron

45

41

9%

3

14

-

59

80

(26)%

  Billet

4

13

(72)%

1

3

7%

7

23

(70)%

  TMT Bar

106

62

72%

25

90

18%

196

144

36%

  Wire Rod

110

103

7%

29

98

12%

208

182

14%

  Ductile Iron Pipes

20

28

(26)%

13

37

(44)%

57

57

-

3 June 2018 was the first full month post Vedanta Limited's 90% acquisition of ESL. Previous period numbers are memorandum information for the purpose of performance evaluation of the Company

 

Vedanta Limited completed the acquisition of 90% share capital of Electrosteel Steels Limited (ESL) on 4 June 2018, following which we will be consolidating the financials of ESL for a 10 month period in FY2019. ESL has steelmaking design capacity of 2.5 mtpa in Bokaro, Jharkhand with blast furnace/basic-oxygen-furnace technology.

                                                                                                                       

Total production for the quarter was 285,000 tonnes, 16% higher y-o-y and 18% higher q-o-q as a result of improved availability of raw material, restarting of 0.4 Mt Blast Furnace-3 from August 2018, as well as, improved plant availability and utilisation. In line with our stated priorities to stablise production and ramp up to 1.5 mtpa, we exited at a monthly run rate of 1.3 mtpa.

 

Copper - India

 

Particulars (in'000 tonnes, or as stated)

Q2

Q1

Half Year

 FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

 FY 2019

FY 2018

% Change YoY

COPPER- INDIA

 

 

 

 

 

 

 

 

  Copper - Cathodes

15

106

(86)%

24

(37)%

40

197

(80)%

  Tuticorin Power Sales (MU)

-

4

-

-

-

-

34

-

 

Smelting operations at Tuticorin have been halted since end March. The Company has appealed before the National Green Tribunal (NGT), Principal Bench. Hearing the appeal, the NGT has referred the matter to an Independent Committee which will go through the reports produced on the issue of environmental compliance. We expect the Independent Committee to take a decision in Q3 FY2019.

 

Our Silvassa refinery and wire rod plant continues to operate. This enables us to cater our domestic market.

 

Copper - Zambia

 

Particulars (in'000 tonnes, or as stated)

Q2

Q1

Half Year

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

FY 2018

COPPER -ZAMBIA

 

 

 

 

 

 

 

 

Mined metal

25

25

4%

23

9%

49

45

9%

Copper - Total

49

54

(10)%

46

7%

94

101

(7)%

    Integrated

23

22

4%

25

(6)%

48

43

11%

    Custom

25

32

(20)%

21

21%

47

58

(20)%

 

Q2 FY2019 vs. Previous Quarters

Mined metal production was 25,000 tonnes during Q2 FY2019, up 4% y-o-y and 9% q-o-q.

 

With deep regret, we reported two fatalities during the quarter at the Konkola mine. Consequently, production activities were temporarily suspended for close to a month at one of the shafts followed by an extensive safety pause and a detailed safety assessment of each area of operation to ensure zero-harm in the future. Therefore, the production at Konkola was at 8,100 tonnes, 11% lower y-o-y, however 3% higher q-o-q.  Equipment mobilisation programme, as well as dewatering and development by business partners is expected to revive gradually in Q3 FY2019.

 

Production from Nchanga open pit improved during the quarter to 4,600 tonnes by 24% y-o-y and 63% q-o-q due to higher throughput as a result of accelerated waste excavation at the pits.

 

Tailings leach plant recorded a production of 12,700 tonnes, an improvement of 9% y-o-y and 1% q-o-q due to consistent feed-grades and higher copper recoveries as a result of improved pumps & plant availability and reliable process controls.

 

Custom volumes were at 25,000 tonnes, lower by 20% y-o-y due to lower concentrate availability in the region following high demand. This was, however, 21% higher q-o-q as a result of incremental supplies from Democratic Republic of Congo.

 

H1 FY2019 vs H1 FY2018

 

Mined metal production increased to 49,000 tonnes, 9% higher y-o-y. Integrated volumes were at 48,000 tonnes, 11% higher y-o-y in line with the higher mined metal production. Custom volumes decreased to 47,000 tonnes, 20% lower compared to H1 FY2018 mainly due to lower concentrate availability in the market.

 

Aluminium

 

Particulars(in'000 tonnes, or as stated)

Q2

Q1

Half Year

 FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

 FY 2019

FY 2018

% Change YoY

ALUMINIUM

 

 

 

 

 

 

 

 

Alumina-Lanjigarh

348

269

30%

325

7%

673

572

18%

Total Aluminum Production

494

401

23%

482

3%

976

753

30%

     Jharsuguda-I

137

99

39%

136

1%

273

191

43%

     Jharsuguda-II4

216

157

37%

204

6%

420

277

51%

     BALCO-I

64

65

(2)%

64

 (1)%

128

128

-

     BALCO-II5

78

79

(2)%

77

1%

155

156

(1)%

 

Q2 FY2019 vs. Previous Quarters

 

The Lanjigarh refinery produced 348,000 tonnes of alumina in Q2 FY2019, 30% higher y-o-y due to debottlenecking and Odisha bauxite sourcing from Odisha Mining Corporation (OMC). This was 7% higher q-o-q due to Odisha bauxite sourcing from OMC. Improved captive alumina production and indigenous bauxite are key in our efforts to drive the aluminium costs lower.

 

Aluminium production in Q2 FY2019 was at 494,000 tonnes, up 23% y-o-y as a result of ramp up at the Jharsuguda-I smelter which was completed in Q3 FY2018 and ongoing ramp-up of Jharsuguda II smelter. The production was 3% higher q-o-q. At Jharsuguda II, Line 3 has progressively ramped up with 303 out of 336 pots operational by quarter end as compared to 245 pots at the end of Q1 FY2019. Line 4 continues to be under evaluation. Stabilised aluminium production (i.e. production excluding trial run) was 476,000 tonnes in Q2 FY2019.

 

Continued demand-supply imbalance in domestic coal resulted in coal price increase and disruptions in domestic coal availability for the captive power plants during the quarter. This resulted in power import in the Aluminium segment. Coal procurement continues to be a key focus area for management. We are engaging with Coal India to improve e-auction coal availability and materialisation of existing linkages. Additional eligible quantities are being secured in the on-going Tranche IV auction with materialisation expected from Q4 FY2019. This will improve coal availability and therefore help to drive costs down.

 

H1 FY2019 vs. H1 FY2018

 

Aluminium production increased to 976,000 tonnes in H1 FY2019, 30% higher y-o-y, mainly on account of the ramp up of Jharsuguda I smelter which was completed in Q3 FY2018 post the April 2017 outage and the ongoing ramp up of additional pots at Jharsuguda II. Alumina production was 673,000 tonnes, 18% higher y-o-y.

 

Power

 

Particulars (in million units)

Q2

Q1

Half Year

 FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

 FY 2019

FY 2018

% Change YoY

Power

 

 

 

 

 

 

 

 

Total Power Sales

3,514

2,950

19%

3,315

6%

6,830

4,787

43%

   Jharsuguda 600 MW

124

93

35%

164

(24)%

289

657

(56)%

   TSPL

2,725

2,582

6%

2,355

16%

5,081

3,145

62%

   BALCO 600 MW

480

132

-

656

(27)%

1,137

682

67%

   MALCO*

-

0

-

-

-

-

4

-

   HZL Wind Power

185

143

29%

139

33%

324

299

8%

   TSPL - Availability

94%

87%

-

91%

-

93%

54%

-

*continues to be under care and maintainance as of 26th May 2017 due to low demand in Southern India

 

Q2 FY2019 vs. Previous Quarters

 

During Q2 FY2019, power sales were 3,514 million units. TSPL power sales were 2,725 million units with 94% availability. At TSPL, the Power Purchase Agreement with the Punjab State Electricity Board compensates us based on the availability of the plant.

 

The 600MW Jharsuguda power plant operated at a lower plant load factor (PLF) of 2% in Q2 FY2019 (PLF of 7% in Q2 FY2018, 5% in Q1 FY2019). Power sales this quarter were also met through 3rd party power purchases.

 

The 600 MW BALCO IPP operated at a PLF of 45% in Q2 FY2019 (PLF of 28% in Q2 FY2018, 57% in Q1 FY2019). The PLF has reduced q-o-q primarily due to coal shortages.

 

H1 FY2019 vs. H1 FY2018

 

During H1 FY2019, power sales was at 6,830 million units, 43% higher y-o-y mainly on account of TSPL plant shutdown due to a fire incident in the coal conveyor in Q1 FY2018.

 

Production Summary (Unaudited)

(In '000 tonnes, except as stated)

Particulars

Q2

Q1

H1

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

 FY 2018

% Change YoY

ZINC INDIA

 

 

 

 

 

 

 

 

Mined metal content

232

219

6%

212

10%

444

452

(2)%

Integrated metal

212

230

(8)%

214

(1)%

425

459

(7)%

Refined Zinc - Integrated

162

192

(16)%

172

(5)%

334

386

(13)%

Refined Lead - Integrated1

49

38

30%

42

17%

91

73

25%

Silver- Integrated (in mn ounces)2

5.5

4.5

23%

4.4

25%

10.0

8.2

22%

ZINC INTERNATIONAL

28

42

(34)%

25

11%

54

74

(28)%

Zinc -Refined -Skorpion

15

23

(35)%

10

42%

25

36

(31)%

Mined metal content - BMM

13

20

(32)%

15

(11)%

29

38

(25)%

OIL AND GAS

 

 

 

 

 

 

 

 

Average Daily Gross Operated Production (boepd)

185,926

180,955

3%

194,986

(5)%

190,431

184,062

3%

   Rajasthan

155,194

153,238

1%

164,040

(5)%

159,593

156,278

2%

   Ravva

13,496

17,266

(22)%

14,217

(5)%

13,855

17,810

(22)%

   Cambay

17,236

10,452

65%

16,729

3%

16,984

9,974

70%

Average Daily Working Interest Production (boepd)

118,748

115,332

3%

124,807

(5)%

121,761

117,391

4%

   Rajasthan

108,636

107,267

1%

114,828

(5)%

111,715

109,395

2%

   Ravva

3,037

3,885

(22)%

3,199

(5)%

3,117

4,007

(22)%

   Cambay

6,894

4,181

65%

6,692

3%

6,794

3,990

70%

   KG-ONN

181

-

-

89

-

135

-

-

Total Oil and Gas (million boe)

 

 

 

 

 

 

 

 

   Oil & Gas- Gross

17.1

16.6

3%

17.7

(4)%

34.8

33.7

3%

   Oil & Gas-Working Interest

10.9

10.6

3%

11.4

(4)%

22.3

21.5

4%

IRON ORE (in million dry metric tonnes, or as stated) 

 

 

 

 

 

 

 

 

Sales

0.4

0.7

(51)%

1.4

(74)%

1.8

3.0

(41)%

     Goa

0.1

0.1

(14)%

1.0

(89)%

1.2

2.0

(42)%

     Karnataka

0.2

0.6

(59)%

0.4

(31)%

0.6

1.0

(41)%

Production of Saleable Ore

1.4

1.2

16%

1.4

(1)%

2.8

4.5

(38)%

     Goa

-

0.4

-

0.2

-

0.2

2.6

(91)%

     Karnataka

1.4

0.9

56%

1.2

19%

2.6

1.9

36%

     Pig Iron ('000 tonnes)

173

137

26%

167

4%

339

300

13%

 

 

 

 

                                                                                                        (In '000 tonnes, except as stated)

Particulars

Q2

Q1

H1

FY 2019

FY 2018

% Change YoY

FY 2019

% Change QoQ

FY 2019

 FY 2018

% Change YoY

STEEL3

 

 

 

 

 

 

 

 

Production

285

247

16%

242

18%

527

485

9%

  Pig Iron

45

41

9%

14

-

59

80

(26)%

  Billet

4

13

(72)%

3

7%

7

23

(70)%

  TMT Bar

106

62

72%

90

18%

196

144

36%

  Wire Rod

110

103

7%

98

12%

208

182

14%

  Ductile Iron Pipes

20

28

(26)%

37

(44)%

57

57

-

COPPER - INDIA

 

 

 

 

 

 

 

 

  Copper -  Cathodes

15

106

-

24

(37)%

40

197

-

  Tuticorin Power Plant Sales (MU)

-

4

-

-

-

-

34

-

COPPER - ZAMBIA

 

 

 

 

 

 

 

 

Mined metal

25

25

4%

23

9%

49

45

9%

Copper - Total

49

54

(10)%

46

7%

94

101

(7)%

  Integrated

23

22

4%

25

(6)%

48

43

11%

  Custom

25

32

(20)%

21

21%

47

58

(20)%

ALUMINUM

 

 

 

 

 

 

 

 

Alumina-Lanjigarh

348

269

30%

325

7%

673

572

18%

Total Aluminum Production

494

401

23%

482

3%

976

753

30%

    Jharsuguda-I

137

99

39%

136

1%

273

191

43%

    Jharsuguda-II4

216

157

37%

204

6%

420

277

51%

    BALCO-I

64

65

(2)%

64

(1)%

128

128

-

    BALCO-II5

78

79

(2)%

77

1%

155

156

(1)%

POWER (in million units)

 

 

 

 

 

 

 

 

Total Power Sales

3,514

2,950

19%

3,315

6%

6,830

4,787

43%

   Jharsuguda 600 MW

124

93

35%

164

(24)%

289

657

(56)%

   TSPL

2,725

2,582

6%

2,355

16%

5,081

3,145

62%

   BALCO 600 MW

480

132

-

656

(27)%

1,137

682

67%

   MALCO

-

0

-

-

-

-

4

-

   HZL Wind Power

185

143

29%

139

33%

324

299

8%

TSPL - Availability

94%

87%

-

91%

-

93%

54%

-

Ports - VGCB (in million tonnes) 6

 

 

 

 

 

 

 

 

   Cargo Discharge

1.2

1.1

11%

1.5

(23)%

2.7

2.3

19%

   Cargo Dispatches

1.2

1.2

3%

1.5

(19)%

2.7

2.3

21%

1.     Excluding captive consumption of 1,799 tonnes in Q2 FY2019 vs. 1,634 tonnes in Q2 FY2018 and 1,778 tonnes in Q1 FY2019. It was 3,577 tonnes in H1 FY2019 vs. 3,590 tonnes in H1 FY2018

2.     Excluding captive consumption of 296,000 ounces in Q2 FY2019 vs. 281,000 ounces in Q2 FY2018 and 303,000 ounces in Q1 FY2019. It was 598,000 ounces in H1 FY2019 vs. 609,000 ounces in H1 FY2018

3.     June 2019 2018 was the first full month post Vedanta Limited's 90% acquisition of ESL. Previous period numbers are memorandum information for the purpose of performance evaluation of the Company

4.     Including trial run production of 18 kt in Q2 FY2019, 15 kt in Q2 FY2018 and 12 kt in Q1 FY2019. It was 30 kt in H1 FY2019 vs. 34 kt in H1 FY2018

5.     Including trial run production of Nil in Q2 FY2019, 1 kt in Q2 FY2018 and Nil in Q1 FY2019. It was Nil in H1 FY2019 vs. 16 kt in H1 FY2018

6.     Vizag General Cargo Berth

 

For further information, please contact:

 

Communications                                 Finsbury

 

Arun Arora

Head, Corporate Communications

Tel: +91 124 459 3000

[email protected]

 

Daniela Fleischmann

Tel: +44 20 7251 3801

 

 

 

 

 

 

 

Investors

 

 

Rashmi Mohanty

Director - Investor Relations

 

 

Sunila Martis

Associate General Manager - Investor Relations

 

Veena Sankaran

Manager - Investor Relations

Tel: +44 20 7659 4732

Tel:  +91 22 6646 1531

[email protected]

 

             

 

About Vedanta Resources

Vedanta Resources plc ("Vedanta") is a diversified global natural resources company. The group produces aluminium, copper, zinc, lead, silver, iron ore, oil & gas and commercial energy. Vedanta has operations in India, Zambia, Namibia, South Africa, Ireland and Australia. With an empowered talent pool globally, Vedanta places strong emphasis on partnering with all its stakeholders based on the core values of trust, sustainability, growth, entrepreneurship, integrity, respect and care.

 

To access the Vedanta Sustainable Development Report 2018, please visit http://www.vedantaresources.com/media/237848/vedanta-sd-report-2017-18.pdf. For more information on Vedanta Resources, please visit www.vedantaresources.com

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and/or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.
 