Information  X 
Enter a valid email address

Sound Energy updates on Sidi Moktar

By BFN News | 07:44 AM | Wednesday 17 May, 2017


Sound Energy said the SAIPEM rig has now arrived at the company's Sidi Moktar asset, onshore Morocco, ahead of the re-entry and testing of the Lower and Middle Jurassic in two existing wells on the Kechoula discovery. The Sidi Moktar licences covered 2700 sq km in the Essaouira basin, central Morocco, and contained an existing gas discovery in the Lower Liassic (Kechoula) and significant pre-salt potential. Sidi Moktar was close to existing infrastructure and gas demand, including the large scale Moroccan state owned OCP Phosphate plant. The two wells to be re-entered and tested by the Company, Koba-1 and Kamar-1, had already been drilled at Kechoula by previous operators and had been estimated to have an unrisked mid case original gas in place (GOIP) in the Lower Liassic reservoir of 293 Bscf (gross). "The company notes the quantitive assesment prepared by a previous operator in 1998 which referred to exploration potential of the Sidi Moktar licences of up to 9 Tcf unrisked GOIP (gross) in the TAGI and Paleozoic. "The Company will require the reprocessing of existing 2D seismic, acquisition of new 2D seismic and drilling results before forming its own volume estimates for the exploration potential of the Sidi Moktar licences." Story provided by StockMarketWire.com

a d v e r t i s e m e n t