Financial Express (Holdings) Limited (“we”, “our”, “us” and derivatives) are committed to protecting and respecting your privacy. This Privacy Policy, together with our Terms of Use, sets out the basis on which any personal data that we collect from you, or that you provide to us, will be processed by us relating to your use of any of the below websites (“sites”).

  • FEAnalytics.com
  • FEInvest.net
  • FETransmission.com
  • Investegate.co.uk
  • Trustnet.hk
  • Trustnetoffshore.com
  • Trustnetmiddleeast.com

For the purposes of the Data Protection Act 1998, the data controller is Trustnet Limited of 2nd Floor, Golden House, 30 Great Pulteney Street, London, W1F 9NN. Our nominated representative for the purpose of this Act is Kirsty Witter.

WHAT INFORMATION DO WE COLLECT ABOUT YOU?

We collect information about you when you register with us or use any of our websites / services. Part of the registration process may include entering personal details & details of your investments.

We may collect information about your computer, including where available your operating system, browser version, domain name and IP address and details of the website that you came from, in order to improve this site.

You confirm that all information you supply is accurate.

COOKIES

In order to provide personalised services to and analyse site traffic, we may use a cookie file which is stored on your browser or the hard drive of your computer. Some of the cookies we use are essential for the sites to operate and may be used to deliver you different content, depending on the type of investor you are.

You can block cookies by activating the setting on your browser which allows you to refuse the setting of all or some cookies. However, if you use your browser settings to block all cookies (including essential cookies) you may not be able to access all or part of our sites. Unless you have adjusted your browser setting so that it will refuse cookies, our system will issue cookies as soon as you visit our sites.

HOW WE USE INFORMATION

We store and use information you provide as follows:

  • to present content effectively;
  • to provide you with information, products or services that you request from us or which may interest you, tailored to your specific interests, where you have consented to be contacted for such purposes;
  • to carry out our obligations arising from any contracts between you and us;
  • to enable you to participate in interactive features of our service, when you choose to do so;
  • to notify you about changes to our service;
  • to improve our content by tracking group information that describes the habits, usage, patterns and demographics of our customers.

We may also send you emails to provide information and keep you up to date with developments on our sites. It is our policy to have instructions on how to unsubscribe so that you will not receive any future e-mails. You can change your e-mail address at any time.

In order to provide support on the usage of our tools, our support team need access to all information provided in relation to the tool.

We will not disclose your name, email address or postal address or any data that could identify you to any third party without first receiving your permission.

However, you agree that we may disclose to any regulatory authority to which we are subject and to any investment exchange on which we may deal or to its related clearing house (or to investigators, inspectors or agents appointed by them), or to any person empowered to require such information by or under any legal enactment, any information they may request or require relating to you, or if relevant, any of your clients.

You agree that we may pass on information obtained under Money Laundering legislation as we consider necessary to comply with reporting requirements under such legislation.

ACCESS TO YOUR INFORMATION AND CORRECTION

We want to ensure that the personal information we hold about you is accurate and up to date. You may ask us to correct or remove information that is inaccurate.

You have the right under data protection legislation to access information held about you. If you wish to receive a copy of any personal information we hold, please write to us at 3rd Floor, Hollywood House, Church Street East, Woking, GU21 6HJ. Any access request may be subject to a fee of £10 to meet our costs in providing you with details of the information we hold about you.

WHERE WE STORE YOUR PERSONAL DATA

The data that we collect from you may be transferred to, and stored at, a destination outside the European Economic Area (“EEA”). It may be processed by staff operating outside the EEA who work for us or for one of our suppliers. Such staff may be engaged in, amongst other things, the provision of support services. By submitting your personal data, you agree to this transfer, storing and processing. We will take all steps reasonably necessary, including the use of encryption, to ensure that your data is treated securely and in accordance with this privacy policy.

Unfortunately, the transmission of information via the internet is not completely secure. Although we will do our best to protect your personal data, we cannot guarantee the security of your data transmitted to our sites; any transmission is at your own risk. You will not hold us responsible for any breach of security unless we have been negligent or in wilful default.

CHANGES TO OUR PRIVACY POLICY

Any changes we make to our privacy policy in the future will be posted on this page and, where appropriate, notified to you by e-mail.

OTHER WEBSITES

Our sites contain links to other websites. If you follow a link to any of these websites, please note that these websites have their own privacy policies and that we do not accept any responsibility or liability for these policies. Please check these policies before you submit any personal data to these websites.

CONTACT

If you want more information or have any questions or comments relating to our privacy policy please email publishing@financialexpress.net in the first instance.

 Information  X 
Enter a valid email address

Vedanta Resources (VED)

  Print      Mail a friend       Annual reports

Thursday 08 April, 2010

Vedanta Resources

Q4 and FY 2010 Production Res

RNS Number : 8633J
Vedanta Resources PLC
08 April 2010
 



8 April 2010

 

Vedanta Resources plc

Production Release for the Fourth Quarter and Year Ended 31 March 2010

 

Highlights

§ 210 ktpa zinc smelter at Dariba and 1 mtpa zinc concentrator at Rampura Agucha commissioned, three months ahead of schedule

§ Mid shaft loading station at the Konkola Deep Mine Project commissioned

§ Significant increase in annual production in all businesses

§ Record quarterly production of iron ore and aluminium during Q4 FY2010

 

Zinc

 

Mined metal production in Q4 was 194,000 tonnes, marginally lower than the corresponding prior quarter. Full year production increased by 5% to 769,000 tonnes compared to the previous year reflecting improved mining performance.

 

Refined zinc and lead production in Q4 2010 was 150,000 tonnes and 20,000 tonnes respectively, in line with the corresponding prior quarter. Full year production of zinc & lead was 578,000 tonnes and 72,000 tonnes, an increase of 5% and 11% respectively, over the previous year due to higher operational efficiencies. In Q4 we sold 86,000 dry metric tonnes of surplus zinc concentrate and 10,000 dry metric tonnes of surplus lead concentrate.

 

Silver production was 1.65 million ounces in Q4 2010, 9% higher compared to the corresponding prior period. Full year silver production was 5.7 million ounces, 34% higher than FY 2009.

 

The new 210 ktpa zinc smelter at Rajpura Dariba and the new 1 mtpa concentrator at Rampura Agucha were commissioned during the end of the quarter, three months ahead of schedule. Consequently, the total zinc smelting capacity has increased to 879 ktpa.

 

Construction activity at the 100 ktpa lead smelter at Dariba and the 160MW CPP is progressing well for scheduled completion in Q2 FY2011.

 

The Sindesar Khurd mine project is on schedule for progressive commissioning from Q1 FY 2011.

 

Iron Ore

During Q4, Sesa Goa shipped 7.4 million tonnes of iron ore, (with 1.8 million tonnes contributed by Dempo) compared to 5.0 million tonnes in the corresponding prior quarter.  Despatches for the year were 20.5 million tonnes, an increase of 36% compared to 15.1 million tonnes in the corresponding prior period.

 

Production in Q4 and the full year was 7.8 million tonnes and 21.4 million tonnes respectively, an increase of 59% and 34% over corresponding periods, a result of 3.6 million tonnes contribution from Dempo's operations and increased throughput from existing Sesa's operations.

 

The expansion of iron ore capacity to 50mtpa by FY 2013 is progressing well, with a combination of mining and logistics capacity enhancements in progress.

 

Expansion of the pig iron plant capacity to 625 ktpa and associated expansion of metallurgical coke plant capacity to 560 ktpa is progressing well for scheduled commissioning by Q1 FY 2012.

 

Copper ― India and Australia

 

Copper cathode production at the Tuticorin smelter was 80,000 tonnes in Q4, lower than the corresponding prior quarter primarily due to low copper grades. Cathode production for FY2010 was 334,000 tonnes, an increase of 7% compared to the previous year.

 

Our Australian copper mines have achieved normal production following the mud rush earlier this year and contributed 7,000 tonnes of mined metal production in Q4. Full year production was 24,000 tonnes.

 

The 400 ktpa copper smelter project and associated captive power plant at Tuticorin is progressing well, with detailed engineering and procurement activities underway for scheduled commissioning by mid 2011.

 

Copper ― Zambia

 

At our Zambian operations, integrated cathode production was 34,000 tonnes during Q4, an increase of 26% over the corresponding prior quarter and 15% higher than the immediately prior quarter. Cathode production from custom smelting was 19,000 tonnes during Q4. Total cathode production in FY 2010 was 173,000 tonnes, 30% higher than the previous year.

 

The mid shaft loading station at the Konkola Deep Mine Project was commissioned in March 2010 as scheduled, resulting in an increase in the hoisting capacity of the mine. Construction work on the bottom shaft sinking is progressing on schedule, for completion by Q3 FY 2012.

 

Aluminium

 

Aluminium production in Q4 was a record 159,000 tonnes, a 19% increase over the corresponding prior quarter and full year aluminium production of 533,000 tonnes was 15% higher than the previous year. The increases were mainly on account of 264,000 tonnes contributed by the Jharsuguda aluminium smelter during the year, partially offset on shut down of BALCO I smelter, in Q1. The Balco II smelter continues to operate above its rated capacity.

 

The first 250 ktpa smelter at Jharsuguda has been stabilised and is operating at close to its rated capacity. Progressive commissioning of second 250 ktpa smelter is underway with 209 pots out of 304 pots commissioned and the remaining 99 pots expected to be commissioned by May 2010. All nine units of the 1,215 MW CPP are now operational.

 

1.25 mtpa Jharsuguda II aluminium smelter project is progressing well with the first metal tapping expected in Q1 FY2011 and full commissioning in Q2 FY 2013 as per schedule.

 

The alumina refinery at Lanjigarh produced 762,000 tonnes of Alumina during the year. The 600 ktpa de-bottlenecking project is now scheduled for completion in Q1 FY 2011. Progress on the 3 mtpa expansion project is on schedule.

 

The first metal tapping from the 325 ktpa aluminium smelter project at BALCO is expected in Q4 FY 2011. Construction of the 1,200MW captive power plant is progressing well and the first unit is expected to be synchronised in Q3 FY2011, with the remaining three units progressively synchronised by Q2 FY2012.

 

Energy

 

We sold 956 million units of power during the quarter compared to 435 million units sold in the corresponding prior quarter. This was mainly on account of surplus power from BALCO 1 due to the shut down of aluminium operations, and from the Jharsuguda CPP.  For the full year, 3,279 million units of power were sold, compared to 882 million units in FY 2009.

 

The first unit of the 2,400MW IPP at Jharsuguda is expected to get commissioned in Q1 FY 2011, with the remaining three units to be progressively commissioned by the end of FY 2011.

 

At the 1,980 MW supercritical IPP project at Talwandi Sabo, the EPC contract has been finalised. The EPC contractor has appointed subcontractors to carry out pre-construction activities at the site and orders have also been placed for turbines, generators and power houses. Project completion is expected by Q2 FY 2014.

 

Note: The energy segment includes temporary surplus power sales from various captive power plants in addition to the sales from power plants of 100 MW at MALCO, 270 MW at BALCO-1, and 123 MW wind power plant at HZL.



 

Production Summary (Unaudited)

 

( in '000 tonnes, except as stated)


Quarter ended 31 March

Year ended 31 March

Particulars

2010

2009

Change

2010

2009

Change

Alumina







   Korba I/Mettur 1

-

42

-

43

241

-

   Lanjigarh

203

171

18.7%

762

586

30.0%

Aluminium

159

134

18.7%

533

462

15.4%

   Jharsuguda

91

49

85.7%

264

82

222.0%

   Korba II

64

62

3.2%

250

251

-

   Korba I/Mettur 1

4

23

-

18

129

-

Copper- India / Australia







  Copper - Mined metal content

7

8

(12.5%)

24

27

(11.1%)

  Copper -  Cathodes

80

88

(9.1%)

334

313

6.7%

Copper - Zambia

53

35

51.4%

173

133

      30.1%

  Integrated

34

27

25.9%

127

108

17.6%

  Custom

19

8

137.5%

46

25

84.0%

Zinc







   Zinc - Mined metal content

194

198

(2.0)%

769

735

4.6%

   Zinc -refined

150

151

-

578

552

4.7%

   Lead -refined 2

20

18

     11.1%

72

65

10.8%

   Silver (in '000 ounces) 3

1,653

1,523

8.5%

5,671

4,235

33.9%

Iron Ore  







   Saleable Ore 4

7.8

4.9

59.2%

21.4

16.0

33.8%

Energy (in million units)

956

435

119.8%

3,279

882

271.8%

   BALCO, MALCO, HZL Wind 5

617

192

221.4%

2,187

376

481.6%

   Surplus from CPP's 6

339

243

39.5%

1,092

506

115.8%

 

1.     Plants no longer operational

2.     Including captive consumption of 1,601 tonnes vs 2,302 tonnes in Q4 FY2010 vs Q4 FY2009 and 7,308 tonnes vs 5,010 tonnes  in FY 2010 vs FY 2009

3.     Including captive consumption of  268,000 ounces vs 392,000 ounces in Q4 FY2010 vs Q4 FY2009 and 1,216,000 ounces vs 858,000 ounces in FY 2010 vs FY 2009

4.     Iron ore is reported on wet tonnes basis

5.     Power sold from BALCO 270MW, MALCO and HZL Wind power

6.     Power sold from various CPP's

 

 

 

 

For further information, please contact:

 

Ashwin Bajaj                                                               investorrelations@vedanta.co.in

Vice President - Investor Relations                           Tel: +91 22 6646 1531

Vedanta Resources plc

 

Saurabh Kothari                                                         investorrelations@vedanta.co.in

Investor Relations                                                       Tel: +91 22 6646 1531

Vedanta Resources plc

 

Gordon Simpson                                                         Tel: +44 20 7251 3801

Finsbury

 

 

About Vedanta Resources plc

Vedanta Resources plc ("Vedanta") is a London listed FTSE 100 diversified metals and mining

major. The group produces aluminium, copper, zinc, lead, iron ore and commercial energy.

Vedanta has operations in India, Zambia and Australia and a strong organic growth pipeline of

projects. With an empowered talent pool of 30,000 employees globally, Vedanta places strong

emphasis on partnering with all its stakeholders based on the core values of entrepreneurship,

excellence, trust, inclusiveness and growth. For more information visit www.vedantaresources.com

 

 

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future,

not past, events. In this context, forward-looking statements often address our expected future

business and financial performance, and often contain words such as "expects," "anticipates,"

"intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.

 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FR IRMPTMBJMBTM