Exploration Update

RNS Number : 5151Y
Thor Mining PLC
07 September 2022
 

7 September 2022

 

 

Thor Mining PLC

 

("Thor" or the "Company")

 

Exploration Update

 

The directors of Thor Mining Plc ("Thor") (AIM, ASX: THR, OTCQB: THORF) are pleased to provide an exploration update on the Company's 100% owned Wedding Bell and Radium Mountain uranium and vanadium projects in the Uravan Mineral Belt, USA, Ragged Range gold-nickel project in the Pilbara, WA and Molyhil tungsten-molybdenum project, NT.

 

Project highlights:

§ Maiden 2000m drilling program to commence in mid-September 2022 at the priority Rim Rock, Groundhog and Section 23 prospects within the Wedding Bell and Radium Mountain Projects (Figure 2). Site preparation has commenced.

§ Drilling at Rim Rock and Groundhog Prospects is designed to test extensions to high-grade uranium and vanadium mineralisation sampled within and around historic workings of up to 1.25% uranium (U3O8) and 3.47% vanadium (V2O5) (THOR ASX, AIM: 21 July 2020).

§ Section 23 is the highest priority drill target in the Colorado Uranium-Vanadium Project. This area represents the only large area in the claim block with the perspective "Salt Wash" Member precluded from historic prospecting, drilling and mine production.

§ Drill assay results from the recently completed 3000m RC drilling program at Sterling Prospect, Ragged Range Project are pending due to delays with the laboratory (THR ASX, AIM; 11 July 2022).

§ Sampling at Kelly's prospect, Ragged Range continues to return high-grade gold and copper rock chip results including 15.5g/t Au (and 185 g/t Ag) and 0.91g/t Au (and 535 g/t Ag).

§ Airborne Magnetics Survey over the eastern portion of Ragged Range tenure completed with interpretation underway, with emphasis on Kelly's copper-gold area and lithium prospective ground associated with the Split Rock super suite (THOR ASX, AIM 1 August 2022).

§ Downhole Electromagnetic Survey (DHEM) completed on Krona nickel drill hole with data interpretation underway.

§ Discussions have commenced with potential Joint Venture partners to progress the Molyhil tungsten-molybdenum project, NT towards development.

 

Nicole Galloway Warland, Managing Director of Thor Mining, commented:

"The Thor team has been busy on the ground at our Ragged Range Project, WA and in the US, at the Wedding Bell Uranium-Vanadium Project, as such we are keen to provide a brief exploration update.

 

 

" We are seeing an increase in the uranium price as it becomes clear that many countries, including the UK, USA and Japan, are revisiting nuclear power as a response to rising energy prices driven by the Ukraine war and as a 'green baseload energy' source to meet decarbonization goals. Thor is positioned well as we advance our uranium-vanadium projects and looking forward to the commencement of our upcoming drilling program. "

 

US Uranium and Vanadium - Wedding Bell and Radium Mountain, Colorado Drilling Program

Thor's maiden 2000m drilling program is to commence mid-September at the Company's 100% owned Wedding Bell and Radium Mountain Projects, located in the historic uranium-vanadium mining district within the Uravan mineral belt, southwest Colorado, USA (See Figure 1).

Douglas Exploration LLC has been contracted to undertake the drilling program, with local contractors commencing the site preparation work in readiness.

Based on initial due diligence completed by Thor, confirming uranium and vanadium mineralisation within the Salt Wash member of the Morrison Formation within the claim area, drilling will test three priority targets at Groundhog, Rimrock and Section 23 Prospects (See Figure 1).

Drilling at Rim Rock and Groundhog Prospects is designed to test extensions to high-grade uranium and vanadium mineralisation sampled within and around historic workings of up to 1.25%U3O8 and 3.47% V2O5 (THOR ASX, AIM: 21 July 2020).

Section 23 (Figure 2) in the southeast corner of the Wedding Bell claim blocks has been identified by Thor Mining and World Industrial Minerals LLC (US Consulting team) as the highest priority drill target in the Colorado Uranium-Vanadium Project. This area represents the only large area in the claim block with the "Salt Wash" Member precluded from historic prospecting, drilling and mine production.  Proposed drill holes for this area are designed to target potential mineralisation in the third sandstone unit estimated to be within 30-40m of surface, stratigraphically, the mapped contact with the overlying upper Brushy Basin Member of the Morrison Formation.

Full details on Thor's US uranium and vanadium projects may be found on Thor's website https://www.thormining.com/projects/us-uranium-and-vanadium .

 

Map Description automatically generated Map Description automatically generated 

 

Figure 1: US Uranium and Vanadium Project location map showing Wedding Bell and Radium Mountain in Colorado and Vanadium King in Utah, USA.

 

Ragged Range Project, Pilbara WA

Thor has continued to undertake mapping and rock chip sampling at Kelly's copper-gold prospect, targeting areas along strike of known copper mineralisation, zones of alteration, shears/faults and zones of brecciation, including sampling along the northwest trending, 1.2km long x 25m wide ridge between Euro Basalt and Boobina Porphyry (Figure 2 and Figure 3).  In addition to the previously reported anomalous gold (up to 1.46g/t) and copper (up to 4.28% Cu) identified (THR ASX: AIM 25 July 2022), new sampling has returned up to 15.5g/t Au (R0070) and up to 535g/t Ag along strike (Table A, Figure 3 and Figure 4).

Drill assay results from the recently completed 3000m RC drilling program at Sterling gold prospect, remain pending due to delays with the laboratory (THR ASX, AIM; 11 July 2022) (Figure 2).

A close-spaced high-resolution airborne magnetics survey over the eastern portion of Ragged Range tenure has been flown, with interpretation underway (Figure 2). Key areas of interest include Kelly's copper-gold prospect and lithium prospective ground associated with the Split Rock Super Suite (THOR ASX, AIM 1 August 2022).

One drill hole was drilled beneath the nickel gossan at Krona Prospect testing a modelled conductor identified from the Fixed Loop Electromagnetic survey.  A downhole electromagnetic survey (DHEM) was subsequently completed with data interpretation underway.

Thor will update the market as soon as assays have been processed, along with interpretations from the two geophysics surveys.

 

Map Description automatically generated

 

Figure 2 : Key Prospects within the Ragged Range Project TenureTable A: Significant samples above 0.1g/t Au and 0.6% Cu (Projection: GDA94 Zone 50)

 

PROSPECT

SAMPLE ID

EASTING

NORTHING

g/t Au

g/t Ag

% COPPER

Sample Type

Kelly's

R00013

797776

7586901

1.46

31.8

NS

Rock Chip

Kelly's

R00014

794733

7588377

 NS

 NS

0.87

Rock Chip

Kelly's

R00015

797143

7587790

0.1

2.4

0.69

Rock Chip

Kelly's

R00016

797131

7587762

 NS

 NS

4.48

Rock Chip

Kelly's

R00017

797234

7587632

0.2

5.6

2.75

Rock Chip

Kelly's

R00042

794076

7586684

0.36

28.8

1.22

Rock Chip

Kelly's

R00070

797778

7586904

15.5

185

NS

Rock Chip

Kelly's

R00076

797618

7587105

0.91

535

NS

Rock Chip

Kelly's

R00075

797646

7587065

0.66

33

NS

Rock Chip

Kelly's

R00069

797792

7586889

0.63

10.6

NS

Rock Chip

Kelly's

R00071

797770

7586902

0.37

40.4

NS

Rock Chip

Kelly's

R00077

797608

7587116

0.33

87.8

NS

Rock Chip

Kelly's

R00074

797646

7587052

0.2

41.8

NS

Rock Chip

Kelly's

R00072

797733

7586951

0.17

9

NS

Rock Chip

Kelly's

R00078

797601

7587123

0.17

133

NS

Rock Chip

Kelly's

R00086

797376

7587411

0.16

29

NS

Rock Chip

NS - Not Significant

 

Map Description automatically generated

Figure 3: Kelly's Sampling Location Map

Oval Callout: 15.5 g/t Au Map Description automatically generated

 

Figure 4: Kelly's Prospect - prospective ridge looking southeast between Euro Basalt and Boobina Porphyry

(1.  https: //www.mindat.org/loc-122951.html )

 

 

Molyhil Tungsten-Molybdenum Project, NT

The Molyhil tungsten-molybdenum-copper deposit is 100% owned by Thor and is located 220km north-east of Alice Springs within the prospective polymetallic province of the Proterozoic Eastern Arunta Block in the Northern Territory (Figure 5).

The Molyhil Project is Thor's most advanced project with significant work having been undertaken including a feasibility study completed in 2018, showing the project to be profitable production with low operating costs and early payback of capex (THR ASX, AIM 23 August 2018).

As part of Thor's corporate strategy to add value to projects through discovery or partnerships, the Company has commenced discussions with potential Joint Venture/Earn-in partners to progress Molyhil towards development.

A full background on the project is available on the Thor Mining website: www.thormining.com/projects .

 

A picture containing text, ground, canyon, outdoor Description automatically generated

Figure 5: Molyhil Project

 

 

 
This announcement is authorised for release to the market by the Board of Directors.

 

For further information, please contact:

 

Thor Mining PLC
 


Nicole Galloway Warland, Managing Director

Ray Ridge, CFO / Company Secretary

Tel: +61 (8) 7324 1935

Tel: +61 (8) 7324 1935



WH Ireland Limited (Nominated Adviser and Joint Broker)

Tel: +44 (0) 207 220 1666

Jessica Cave / Darshan Patel / Megan Liddell




SI Capital Limited (Joint Broker)

Tel: +44 (0) 1483 413 500

Nick Emerson


 


Yellow Jersey (Financial PR)

thor@yellowjerseypr.com

Sarah Hollins / Henry Wilkinson

Tel: +44 (0) 20 3004 9512

 

This announcement contains inside information for the purposes of Article 7 of the UK version of Regulation (EU) No 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018, as amended ("MAR"). Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.

 

 

Competent Persons Report

The information in this report that relates to exploration results is based on information compiled by Nicole Galloway Warland, who holds a BSc Applied geology (HONS) and who is a Member of The Australian Institute of Geoscientists. Ms Galloway Warland is an employee of Thor Mining PLC. She has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Nicole Galloway Warland consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com , which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

 

About Thor Mining PLC


Thor Mining PLC (AIM, ASX: THR; OTCQB: THORF) is a diversified resource company quoted on the AIM Market of the London Stock Exchange, ASX in Australia and OTCQB Market in the United States.

The Company is advancing its diversified portfolio of precious, base, energy and strategic metal projects across USA and Australia. Its focus is on progressing its copper, gold, uranium and vanadium projects, while seeking investment/JV opportunities to develop its tungsten assets.

Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging early stage gold and nickel results in the Pilbara region of Western Australia.

At Alford East in South Australia, Thor is earning an 80% interest in copper deposits considered amenable to extraction via In Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral Resource Estimate of 177,000 tonnes contained copper & 71,000 oz gold¹.

Thor also holds a 30% interest in Australian copper development company EnviroCopper Limited, which in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion of the historic Kapunda copper mine and the Alford West copper project, both situated in South Australia, and both considered amenable to recovery by way of ISR.²

Thor holds 100% interest in two private companies with mineral claims in the US states of Colorado and Utah with historical high-grade uranium and vanadium drilling and production results.

Thor holds 100% of the advanced Molyhil tungsten project, including measured, indicated and inferred resources⁴, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern Territory government in July 2020.

Adjacent to Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium, including Inferred resource estimates for the Bonya copper deposit, and the White Violet and Samarkand tungsten deposits. ⁵

 

Notes

1 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210127-maiden-copper.gold-estimate-alford-east-sa.pdf

2 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20172018/20180222-clarification-kapunda-copper-resource-estimate.pdf  

³ www.thormining.com/sites/thormining/media/aim-report/20190815-initial-copper-resource-estimate---moonta-project---rns---london-stock-exchange.pdf

 4 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20210408-molyhil-mineral-resource-estimate-updated.pdf  

5 www.thormining.com/sites/thormining/media/pdf/asx-announcements/20200129-mineral-resource-estimates---bonya-tungsten--copper.pdf  



 

 

JORC Code, 2012 Edition - Table 1 report template

1.1  Section 1 Sampling Techniques and Data

 

Criteria

JORC Code explanation

Commentary

Sampling techniques

·

· Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

· Aspects of the determination of mineralisation that are Material to the Public Report.

·

The programme comprised

rock chip sampling based on geological outcrops, with analysis for Au by 25g fire assay FA001 and multi-element by mixed acid digest - ICP-AES MA101 and ICP-MS MA102 at Bureau Veritas Minerals Laboratory in Adelaide SA

Drilling techniques

·

Not applicable - no drilling reported

Drill sample recovery

· Method of recording and assessing core and chip sample recoveries and results assessed.

·

· Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

Not applicable - no drilling reported

Logging

·

· Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

·

No logging was undertaken.

Lithological description recorded for all samples collected

Sub- sampling techniques

· If core, whether cut or sawn and whether quarter, half or all core taken.

· If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

· For all sample types, the nature, quality and

Samples were screened in the field as described in "Sampling Techniques" above.

The sample sizes are as per industry standard for stream


Criteria

JORC Code explanation

Commentary

and sample preparation

appropriateness of the sample preparation technique.

·

· Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

· Whether sample sizes are appropriate to the grain size of the material being sampled.

sediment geochemistry.

Field duplicates and blank samples were submitted for assay with the other samples.

Quality of assay data and laboratory tests

·

·

· Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

The proposed assay method is appropriate for preliminary exploration.

Verification of sampling and assaying

· The verification of significant intersections by either independent or alternative company personnel.

·

·

· Discuss any adjustment to assay data.

Not undertaken

Location of data points

· Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

· Specification of the grid system used.

·

Hand held GPS - MGA94 zone 50 (GDA)

Data spacing and distribution

· Data spacing for reporting of Exploration Results.

·

· Whether sample compositing has been applied.

Not applicable - no resource is being reported

Orientation of data in relation to geological structure

· Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

·

Orientational bias is not applicable to stream and rockchip sampling at this stage

Sample security

· The measures taken to ensure sample security.

Geochemistry samples were trucked back from

Nullagine to the Bureau Veritas Adelaide, SA

 

Sample Security levels are considered appropriate for preliminary surface geochemistry assessment.

 

Audits or reviews

·

None undertaken

 

 

 

 

 

1.1  Section 2 Reporting of Exploration Results

 

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

·

· The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Exploration results are reported on E46/1190, E46/1262, E46/1393 in Western Australia held 100% by Pilbara Goldfields Pty Ltd, Thor Mining PLC.

Exploration done by other parties

·

Sporadic surface geochemistry over tenure carried out by Great Southern Mines up to 1997.  No previous lithium exploration.

Geology

· Deposit type, geological setting and style of mineralisation.

Yet to be determined

Drill hole Information

· A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

·

No drilling has been undertaken or reported

Data aggregation methods

·

·

· assumptions used for any reporting of metal equivalent

· The values should be clearly stated.

Only rock chip and stream assays have been reported. There has been no data aggregation.

Relationship between mineralisation widths and intercept lengths

· These relationships are particularly important in the reporting of Exploration Results.

· If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

No drilling has been undertaken or reported

Diagrams

·

A sample location plan including current 1:100k scale geology has been provided

Balanced reporting

·

All results have been reported

Other substantive exploration data

·

All data have been reported

Further work

· The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step- out drilling).

·

It is anticipated that follow up and reconnaissance geochemistry (rockchip, soil & stream) and geological mapping will be undertaken over tenure , including Sterling and Kelly's prospects.



 

Criteria

JORC Code explanation

Commentary

Other substantive exploration data

·

All data have been reported

Further work

· The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step- out drilling).

·

It is anticipated that follow up and reconnaissance geochemistry (rockchip, soil & stream) and geological mapping will be undertaken over tuenure , including Sterling and Kellys prospects.

 

 

   

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSSLESMEESEEU

Companies

Thor Energy (THR)
UK 100

Latest directors dealings