Quarterly Activities Report

Berkeley Resources Limited 30 April 2007 QUARTERLY ACTIVITIES REPORT FOR THE QUARTER ENDED 31 March 2007 Berkeley Resources Limited (AIM: BKY.L) is pleased to report on activities during the quarter ended 31 March 2007. • Initial JORC compliant inferred resources of 11.9 million lbs of U3O8 calculated for the Retortillo and Zona 7 deposits in the Salamanca I licence. • Targets defined for possible extensions of Retortillo mineralisation to the southeast and northwest. • Acquisition of eight new areas totalling 22,176 ha, covering extensions of favourable stratigraphy to the west and east of the Salamanca I licence, which increases the Company's groundholding to about 185,000 ha. • Drill targets defined at the Saguazal prospect at Caceres III, with testing to commence shortly. • Substantial increase in drilling activity scheduled for June Quarter to test targets at Saguazal and Ojaranzo (Caceres VI) prospects, and infill and extensions of the Retortillo and Zona 7 deposits. • Mr Scott Yelland - a mining engineer with over 25 years experience managing mining operations around the world, including Spain, joined the Company as Chief Operating Officer. • Subsequent to the end of the quarter the Company completed a placement of 12.5m shares at $1.85 per share, raising $23.1M (£9.65M), with institutional investors in North America, Europe and Australia. 1 EXPLORATION SALAMANCA PROVINCE Exploration in Salamanca Province focussed on preparation of resource estimates for the Retortillo and Zona 7 uranium deposits, which were announced on the 8th April, 2007. This work included: • continuation of the confirmatory drilling program at Retortillo, Zona 7 and Mina Caridad; • a critical review and assessment of historical data in the light of the confirmatory drill program results; • inclusion of all historical drill and assay data in a database; • conversion of historical downhole and core scintillometer radiometric logs to digital forms; and • conversion of radiometrics to equivalent radiometric grades in intervals with no chemical assays. Eight new areas, totalling 22,176 ha, were acquired over favourable stratigraphy in proximity to the Salamanca I tenements. This process also enabled the partial conversion of the Salamanca II and III tenements to PI's. Salamanca I Confirmatory drilling of the Retortillo deposit continued with two diamond drill rigs. Eighteen holes totalling 1880.65m were completed by the end of the quarter. Single holes were also drilled into the Mina Caridad (CAR-001) and Zona 7 (Z7-001) prospects. Drilling at Retortillo is continuing with hole RTO-022 currently in progress. Details for these holes, including assays received from the first fourteen holes (plus the Caridad and Zona 7 holes), are attached as Appendix I. Results confirm the historical assays and radiometric equivalent grades from surrounding JEN and ENUSA drilling and, in some instances, have increased both grade and thickness. In addition, the more detailed geological information acquired by Berkeley Resources has improved our understanding on the controls influencing supergene and primary uranium mineralisation. Notable assays include: Retortillo: RTO-001 19.4 to 40.8m - 21.4m @ 0.153% U3O8 RTO-002 26.0 to 39.5m - 13.5m @ 0.0307% U3O8 RTO-003 13.5 to 25.5m - 12.0m @ 0.0482% U3O8 RTO-004 33.7 to 42.0m - 8.3m @ 0.0706% U3O8 RTO-005 23.0 to 34.0m - 11.0m @ 0.0343% U3O8 RTO-010 33.0 to 40.2m - 7.3m @ 0.0426% U3O8 Zona 7: Z7-001 0.0 to 8.5m - 8.5m @ 0.2841% U3O8 All holes were geologically and radiometrically logged before being sampled (1/4 core) at approximately 1m intervals (intervals varied from 0.5 to 1.5m based on geology) for most of the section, from below surficial cover to the end of the hole. Duplicate 1/4 core samples and blank samples were included and all samples were assayed for total uranium by the Delayed Neutron Count (DNC) method at Activation Laboratories Limited in Ontario, Canada. Check assays, at other laboratories (including ENUSA), and acid soluble U assays and Th analyses are being completed on selected samples, based on an assessment of the initial assay data. Measured core recoveries averaged >93% for the program, and also for each hole with mineralisation (minor core loss occurred in some holes in the Tertiary cover). Historic drilling data for Retortillo has been fully evaluated in parallel with the current drilling program. The resulting re-interpretation of the historic JEN and ENUSA drill data has provided the basis of the 3D models of the Retortillo and Zona 7 deposits and enabled the calculation of JORC compliant resources. The results of this calculation are summarised below: INFERRED RESOURCES AT RETORTILLO & ZONA 7 (200ppm cut-off) Ore Tonnes (Mt) Grade (ppm U3O8) Contained Resource (Mlb U3O8) at 200ppm cutoff Retortillo 6.8 720 10.8 Zona 7 0.62 760 1.1 TOTAL 7.42 723 11.9 Retortillo mineralisation appears to be hosted by the more carbonaceous shale units which have been altered to kyanite/andalusite hornfels by nearby granite. The importance of weathering is indicated by the association of mineralisation with current and past water tables. Structural controls are indicated by the fact that the northeastern limit of thicker mineralisation appears fault-bounded with unmineralised, chlorite-spotted shales to the northeast. Minor granite dykes also occur. Most Retortillo uranium mineralisation occurs as torbernite, meta-autunite and pitchblende, with gummites (oxidized pitchblende) in the Zona 7 area. Mineralisation at Retortillo ranges from <1.0m to 42.0m in thickness with most of the thicker, deeper and higher grade intersections located along a northwesterly trend in proximity to the northeastern limit of the main zone of mineralisation. Overburden thickness is commonly in the range of 20-35m in the main zone, and usually <20m at the northwestern end. Other conclusions from the drilling include: • The geology is similar in all holes with most differences relating to weathering. • The area has a weathered profile extending to at least 50m in which chlorite decomposes to kaolin, sericite and talc and sulphides are replaced by iron oxides. • There is a gently dipping wedge of Tertiary cover composed of poorly consolidated gravels, sands and clay which appear at line 60 and increase to a maximum of about 30m at the southeast limit of mineralisation. • The main lithology is a monotonous sequence of thermally metamorphosed shales intruded by minor granitic and aplitic dykes/sills. The shales have a well developed slaty cleavage. • Mineralisation is concentrated towards the bottom of the weathered zone with a sharp upper limit related to the transition from totally weathered to partially weathered (B/C transition of a weathering profile). • Some mineralisation is related to steeply dipping quartz-pitchblende +/- pyrite veins which may give rise to the zones of higher grade supergene enrichment. Two composite samples for metallurgical testing were collected from half core from the current drilling program and forwarded to SGS - Lakefield - Oretest for comprehensive testwork. One is representative of strongly weathered mineralisation, the other of deeper, essentially primary, mineralisation. Results are expected early in the June quarter. In addition an IP survey was commenced with the aim of providing additional structural information. Elsewhere in the Salamanca I licence the geological/structural mapping was completed and showed: • Caridad mineralisation is related to an area of carbonaceous shales. • Zona 7 mineralisation has considerable potential for additional high-grade, near surface mineralisation. • The area of the Retortillo deposit is structurally complex. A background radon survey was completed to provide baseline environmental information around the Salamanca I area. During the June quarter an RC drilling program of about 5,000m will commence to test the southeast extension of the Retortillo deposit (minimum of 18 holes), and the untested radiometric anomalies that occur along the 3km extension of the Retortillo stratigraphy to the northwest of the Rio Yeltes (minimum of about 45 holes). Salamanca II and III No exploration during the quarter. CACERES REGION Exploration in the Caceres region continued with most work concentrated on the Caceres III area where drill targets have been defined. The recent employment of a senior geologist to take responsibility for the Caceres projects will accelerate activity in the June Quarter. Additional information was obtained relating to COGEMA (CISA) exploration in the region in the 1990's: • Targets were defined by ENUSA/JEN with little regional exploration conducted by CISA. The JEN had employed car-borne radiometrics over most of the prospective outcrop areas. • Chemical analyses were not commonly used in drilling as radiometric equivalents were considered to be reliable. • Saguazal is considered similar to a classic vein type deposit with brittle-ductile deformation playing an important role in ground preparation prior to uranium mineralising episodes. The potential for depth extensions was never evaluated. Caceres I Environmental and heritage base maps and reports for the Caceres I, 'Quejigo' and 'Quejigo 2' tenements were completed. Caceres III Continuing evaluation of the Saguazal mineralisation and radiometric anomalies increased the potential of the prospect. Results of a 2.48km trial IP survey on 5 lines over the main Saguazal mineralisation, in combination with supplementary geological mapping and radiometrics indicate: • Two sub-vertical fracture systems (NE-SW and E-W) • The NE-SW system contains sulphides +/- uranium mineralisation • The contact between a southern granite and a northern granite dips about 45 - 500 to the north but does not appear to be related to mineralisation. • Domal features in the chargeability profiles appear to coincide with the transition between fresh and weathered rock and the presence of sulphides (from old geological drill logs) and possibly uranium. Results from the IP survey have been used to target a 4 - 5 hole program of diamond drilling to test potentially mineralised structures and/or the sub-horizontal zones of potential secondary mineralisation. This program will commence shortly with the aim of clarifying the interpretation of the IP and previous RC and diamond drilling. Baseline radiometric, radon and water sampling surveys are being completed to provide background environmental data before drilling commences. Rock chip sampling was completed over the radiometric anomaly associated with the east-west contract between two granites to the west of the Plasencia Fault. Results should enable a first pass assessment of this prospect. Ground radiometric surveys continued in the area to the north of the main Saguazal anomaly to the north of the Plasencia Fault (Messejana dolerite dyke). A previous traverse showed anomalous radiometric readings and sericite altered granite and/or episyenite occurrences. Caceres VI Granting of this tenement is anticipated shortly and will be followed by additional geological mapping, baseline environmental surveys and an initial diamond drilling program to test the encouraging Ojaranzo prospect. Work programs were presented for the two new tenement applications in the Toledo Region, immediately adjacent to the Caceres VI licence. OTHER EXPLORATION DEVELOPMENTS: The contract for the airborne magnetic and radiometric survey was increased to 8505 line km to allow coverage of the new areas acquired in proximity to the Salamanca I licence, additional targets within the Salamanca II area, and some extensions to the Caceres projects. These surveys are now expected to be completed in May/June 2007 after extensive delays due to aircraft permitting problems. HISTORICAL EVALUATION OF DATA Scanning and checking of the ENUSA data for the Salamanca I area was completed in the ENUSA Mina Fe (Ciudad Rodrigo) offices and the combined database of historical data now contains 222 Gb of information. The continuing detailed systematic evaluation, compilation and assessment of the Penarroya (IGME) and Limoges (COGEMA/CISA) and Ciudad Rodrigo (ENUSA) data sets was accelerated by the employment of a Spain-based contract geologist. Data assessment continues to highlight the high prospectivity of the Caceres III, Caceres VI and Salamanca I areas. EXPLORATION IN THE JUNE QUARTER A substantial increase in exploration activity is scheduled for the June Quarter with one RC rig and three diamond rigs in action. RC drilling will test for the southeast and northwest extensions of the Retortillo deposit, initial diamond drill testing of the Saguazal and Ojaranzo prospects is planned, and the remaining diamond rig will test for extensions of the Zona 7 deposit, and for mineralisation within untested areas of the Retortillo deposit. 2 APPOINTMENT OF CHIEF OPERATING OFFICER Mr Scott Yelland joined the Company as Chief Operating Officer in early April. Mr Yelland is a mining engineer with over 25 years experience managing mining operations around the world, including in Spain. Mr Yelland will manage the Company's current uranium exploration operations in Spain as well as providing technical expertise in Berkeley's assessment of other exploration and development opportunities around the world. Mr Yelland's experience as a mining engineer includes senior appointments in Russia, Australia, Spain, South America and Africa. He was most recently COO of Highland Gold, a leading gold producer in Russia, and spent 4 years as Mines Manager of Navan Resources in Spain. Mr Yelland has a Masters degree in Mining Engineering from Camborne School of Mines. He is a Chartered Engineer and Fellow of the Institute of Mining, Minerals and Materials. Mr Yelland will be entitled to a parcel of market and performance related options to acquire shares in the Company, pursuant to an Employee Incentive Equity Scheme which will be put to shareholders shortly. 3 EXPLORATION PROJECTS IN WESTERN AUSTRALIA Miriam- Bouchers (Sipa earning a 70% interest): No work was undertaken in the period. 4 SHARE PLACEMENT Subsequent to the end of the quarter Berkeley issued 12.5 million new ordinary shares at a price of A$1.85 (£0.77) per share, with institutional investors in Europe, the USA, Canada and Australia. The issue raised A$23.1M (£9.65M) before expenses and will enable the Company to expand its exploration programs in Spain, as well as to pursue new business development opportunities. The placement was coordinated by RBC Capital Markets as lead manager and sole bookrunner, with Mirabaud Securities Limited acting as co-manager. The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Peter Ellis, who is a Member of The Australian Institute of Geoscientists and a consultant of Berkeley Resources Limited. Mr Ellis has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Ellis consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. APPENDIX I: DRILL HOLES COMPLETED IN THE MARCH 2007 QUARTER HOLE ID UTM East UTM North RL Inclination Recovery End of Min Intersections Hole (200ppm) metres Metres metres Degrees % metres From To Int U3O8 (m) (%) RTO-001 719,315 4,520,537 743 -90 92.58 97.0 19.4 41 21.4 0.153 RTO-002 719,402 4,520,455 745 -90 92.63 91.7 26 40 13.5 0.0307 45.2 47 1.8 0.0635 RTO-003 718,603 4,521,085 737 -90 96.15 98.2 13.5 26 12 0.0482 RTO-004 719,969 4,520,074 738 -90 94.6 98.1 23 27 4 0.207 33.7 42 8.3 0.0706 RTO-005 718,565 4,521,180 732 -90 95.6 97.2 9.7 16 6 0.0257 23 34 11 0.0343 RTO-006 718,506 4,521,078 726 -90 97.38 100.2 26.5 28 1.3 0.0259 RTO-007 718,620 4,521,300 747 -90 96.31 100.2 No significant mineralisation CAR-001 715,920 4,526,180 724 -60 96.72 115.7 No significant mineralisation Z7-001 714,951 4,528,728 733 -90 97.93 100.2 0 8.5 8.5 0.2841 RTO-008 719,992 4,520,117 735 -90 98.84 96.3 44 46 2.1 0.0459 RTO-009 719,353 4,520,602 743 -90 95.73 97.7 No significant mineralisation RTO-010 719,956 4,520,031 740 -90 98.68 90.8 33 40 7.2 0.0426 RTO-011 719,376 4,520,648 741 -90 98.43 85.8 37.7 39 1 0.0239 RTO-012 719,933 4,519,986 744 -90 98.7 84.7 No significant mineralisation RTO-013 719,909 4,519,942 728 -90 97.41 81.1 Pending Results RTO-014 719,435 4,520,757 722 -90 98.18 83.7 Pending Results RTO-015 720,038 4,520,188 739 -90 96.95 84.2 Pending Results RTO-016 720,175 4,519,859 739 -90 98.85 111.0 Pending Results RTO-017 719,494 4,520,868 713 -90 94.41 30.1 Pending Results RTO-018 720,085 4,519,794 746 -90 97.21 137.1 Pending Results RTO-019 719,260 4,520,425 740 -90 Hole in Progress RTO-020 720,262 4,519,701 746 -90 Hole in Progress Rule 5.3 Appendix 5B Mining exploration entity quarterly report Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001. Name of entity BERKELEY RESOURCES LIMITED ABN Quarter ended ('current quarter') 40 052 468 569 31 March 2007 Consolidated statement of cash flows Current quarter Year to date Cash flows related to operating activities $A'000 (9 months) $A'000 1.1 Receipts from product sales and related - - debtors 1.2 Payments for (a) exploration and (1,277) (2,879) evaluation - - (b) development - - (c) production (466) (1,068) (d) administration 1.3 Dividends received - - 1.4 Interest and other items of a similar nature received 109 268 1.5 Interest and other costs of finance paid - - 1.6 Income taxes paid - - 1.7 Other - Business development (124) (196) - AIM admission (444) (468) Net Operating Cash Flows (2,202) (4,343) Cash flows related to investing activities 1.8 Payment for purchases of: (a)prospects - - (b)equity investments - - (c) other fixed assets (45) (92) 1.9 Proceeds from sale of: (a)prospects - 350 (b)equity investments - - (c)other fixed assets - - 1.10 Loans to other entities - - 1.11 Loans repaid by other entities - - 1.12 Other - - Net investing cash flows (45) 258 1.13 Total operating and investing cash flows (carried forward) (2,247) (4,085) 1.13 Total operating and investing cash flows (brought forward) (2,247) (4,085) Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. - 3,522 1.15 Proceeds from sale of forfeited shares - - 1.16 Proceeds from borrowings - - 1.17 Repayment of borrowings - - 1.18 Dividends paid - - 1.19 Other - capital raising expenses (5) (10) Net financing cash flows (5) 3,512 Net increase (decrease) in cash held (2,252) (573) 1.20 Cash at beginning of quarter/year to date 7,974 6,295 1.21 Exchange rate adjustments to item 1.20 - - 1.22 Cash at end of quarter 5,722 5,722 Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities Current quarter $A'000 1.23 Aggregate amount of payments to the parties included in item 1.2 218 1.24 Aggregate amount of loans to the parties included in item 1.10 - 1.25 Explanation necessary for an understanding of the transactions Payments include executive remuneration, superannuation, directors' fees and consulting fees. Non-cash financing and investing activities 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Not applicable 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Not applicable Financing facilities available Add notes as necessary for an understanding of the position. Amount available Amount used $A'000 $A'000 3.1 Loan facilities - - 3.2 Credit standby arrangements - - Estimated cash outflows for next quarter $A'000 4.1 Exploration and evaluation 1,200 4.2 Development - Total 1,200 Reconciliation of cash Reconciliation of cash at the end of the quarter (as Current quarter Previous quarter shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. $A'000 $A'000 5.1 Cash on hand and at bank 938 3,796 5.2 Deposits at call 4,784 4,178 5.3 Bank overdraft - - 5.4 Other (provide details) - - Total: cash at end of quarter (item 1.22) 5,722 7,974 Changes in interests in mining tenements Tenement Nature of interest Interest at Interest at reference beginning of end of (note (2)) quarter quarter 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased Issued and quoted securities at end of current quarter Description includes rate of interest and any redemption or conversion rights together with prices and dates. Total number Number quoted Issue price per Amount paid up per security (see note security (see note 3) 3) (cents) (cents) 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions 7.3 +Ordinary securities 89,091,695 89,091,695 Not Applicable Not Applicable 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs 7.5 +Convertible debt securities 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted 7.7 Options Exercise price Expiry date -Director Options 2,000,000 - various various -Unlisted Options 10,600,000 - $0.70 30 April 2010 -Incentive Options 750,000 - $1.00 30 November 2008 7.8 Issued during - - various various quarter - - $0.70 30 April 2010 - - $1.00 30 November 2008 7.9 Exercised during - - various various quarter - - $0.70 30 April 2010 - - $1.00 30 November 2008 7.10 Expired during - - various various quarter - - $0.70 30 April 2010 - - $1.00 30 November 2008 7.11 Debentures (totals only) 7.12 Unsecured notes (totals only) Compliance statement 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4). 2 This statement does give a true and fair view of the matters disclosed. Sign here: ............................................................ Date: 30 April 2007 Company secretary Print name: SHANE CRANSWICK Notes 1 The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report. 2 The 'Nature of interest' (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2. 3 Issued and quoted securities - The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities. 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report. 5 Accounting Standards - ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with. == == == == == This information is provided by RNS The company news service from the London Stock Exchange BXBBV
UK 100

Latest directors dealings