Financial Express (Holdings) Limited (“we”, “our”, “us” and derivatives) are committed to protecting and respecting your privacy. This Privacy Policy, together with our Terms of Use, sets out the basis on which any personal data that we collect from you, or that you provide to us, will be processed by us relating to your use of any of the below websites (“sites”).

  • FEAnalytics.com
  • FEInvest.net
  • FETransmission.com
  • Investegate.co.uk
  • Trustnet.hk
  • Trustnetoffshore.com
  • Trustnetmiddleeast.com

For the purposes of the Data Protection Act 1998, the data controller is Trustnet Limited of 2nd Floor, Golden House, 30 Great Pulteney Street, London, W1F 9NN. Our nominated representative for the purpose of this Act is Kirsty Witter.

WHAT INFORMATION DO WE COLLECT ABOUT YOU?

We collect information about you when you register with us or use any of our websites / services. Part of the registration process may include entering personal details & details of your investments.

We may collect information about your computer, including where available your operating system, browser version, domain name and IP address and details of the website that you came from, in order to improve this site.

You confirm that all information you supply is accurate.

COOKIES

In order to provide personalised services to and analyse site traffic, we may use a cookie file which is stored on your browser or the hard drive of your computer. Some of the cookies we use are essential for the sites to operate and may be used to deliver you different content, depending on the type of investor you are.

You can block cookies by activating the setting on your browser which allows you to refuse the setting of all or some cookies. However, if you use your browser settings to block all cookies (including essential cookies) you may not be able to access all or part of our sites. Unless you have adjusted your browser setting so that it will refuse cookies, our system will issue cookies as soon as you visit our sites.

HOW WE USE INFORMATION

We store and use information you provide as follows:

  • to present content effectively;
  • to provide you with information, products or services that you request from us or which may interest you, tailored to your specific interests, where you have consented to be contacted for such purposes;
  • to carry out our obligations arising from any contracts between you and us;
  • to enable you to participate in interactive features of our service, when you choose to do so;
  • to notify you about changes to our service;
  • to improve our content by tracking group information that describes the habits, usage, patterns and demographics of our customers.

We may also send you emails to provide information and keep you up to date with developments on our sites. It is our policy to have instructions on how to unsubscribe so that you will not receive any future e-mails. You can change your e-mail address at any time.

In order to provide support on the usage of our tools, our support team need access to all information provided in relation to the tool.

We will not disclose your name, email address or postal address or any data that could identify you to any third party without first receiving your permission.

However, you agree that we may disclose to any regulatory authority to which we are subject and to any investment exchange on which we may deal or to its related clearing house (or to investigators, inspectors or agents appointed by them), or to any person empowered to require such information by or under any legal enactment, any information they may request or require relating to you, or if relevant, any of your clients.

You agree that we may pass on information obtained under Money Laundering legislation as we consider necessary to comply with reporting requirements under such legislation.

ACCESS TO YOUR INFORMATION AND CORRECTION

We want to ensure that the personal information we hold about you is accurate and up to date. You may ask us to correct or remove information that is inaccurate.

You have the right under data protection legislation to access information held about you. If you wish to receive a copy of any personal information we hold, please write to us at 3rd Floor, Hollywood House, Church Street East, Woking, GU21 6HJ. Any access request may be subject to a fee of £10 to meet our costs in providing you with details of the information we hold about you.

WHERE WE STORE YOUR PERSONAL DATA

The data that we collect from you may be transferred to, and stored at, a destination outside the European Economic Area (“EEA”). It may be processed by staff operating outside the EEA who work for us or for one of our suppliers. Such staff may be engaged in, amongst other things, the provision of support services. By submitting your personal data, you agree to this transfer, storing and processing. We will take all steps reasonably necessary, including the use of encryption, to ensure that your data is treated securely and in accordance with this privacy policy.

Unfortunately, the transmission of information via the internet is not completely secure. Although we will do our best to protect your personal data, we cannot guarantee the security of your data transmitted to our sites; any transmission is at your own risk. You will not hold us responsible for any breach of security unless we have been negligent or in wilful default.

CHANGES TO OUR PRIVACY POLICY

Any changes we make to our privacy policy in the future will be posted on this page and, where appropriate, notified to you by e-mail.

OTHER WEBSITES

Our sites contain links to other websites. If you follow a link to any of these websites, please note that these websites have their own privacy policies and that we do not accept any responsibility or liability for these policies. Please check these policies before you submit any personal data to these websites.

CONTACT

If you want more information or have any questions or comments relating to our privacy policy please email publishing@financialexpress.net in the first instance.

 Information  X 
Enter a valid email address

Beowulf Mining PLC (BEM)

  Print      Mail a friend       Annual reports

Tuesday 22 March, 2011

Beowulf Mining PLC

Update re Kallak Iron Ire Project

RNS Number : 3423D
Beowulf Mining PLC
22 March 2011
 



 

22 March 2011

Beowulf Mining Plc

("Beowulf" or the "Company")

Update re Kallak Iron Ore Project

Initial assay results received for the first 10 drillholes on Kallak South

Highlights:

·     Assay results received for the first ten drillholes of the Company's diamond drilling programme at its Kallak South iron ore deposit confirm the presence of high grade iron ore of a similar type and quality to that encountered at Kallak North.

 

·     Initial drill results from the ongoing drilling programme confirm the presence of high grade iron mineralisation over significant widths of up to 400 metres. Drilling is expected to be completed by the end of Q2 2011.  Following completion of this programme drilling will recommence at Kallak North.

·     The results of the initial drilling and the measured size of the magnetic anomaly confirm earlier estimates of the presence of more than 400 million tonnes of iron ore at Kallak South.

 

·     Bench scale metallurgical tests, including DTR (Davis Tube Recovery) tests on ore grade material from Kallak South are currently being conducted by MINPRO AB in order to further assess the quality of the iron ore. 

·     Preparation of an independent JORC compliant resource estimate for the Kallak North deposit, based on the Company's 2010 drilling results and historic data is currently ongoing and scheduled to be completed in Q2 2011.

 

·     Work has recently commenced with respect to a planned formal application to transfer the existing exploration permits for the Kallak project area into an exploitation (mining) licence which will, inter alia, involve the commissioning of an Environmental Impact Study (EIS).

·     Subject to the receipt of all necessary regulatory approvals, pilot scale test mining and further metallurgical testing, including further DTR studies, are currently intended to commence in Q1 2012 with deliveries of large quantities of high quality pellet feed material (containing approximately 70% Fe) to potential customers expected to potentially start later in 2012.

Clive Sinclair-Poulton, Executive Chairman of Beowulf, commented:

 

"These initial assay results for Kallak South again demonstrate the Kallak project's considerable potential. The quality of our iron ore remains high while the quantity continues to increase. This combination fully justifies our seeking to accelerate the process of getting Kallak into potential production as soon as possible."

 

Beowulf (AIM: BEM; Aktietorget: BEO), the AIM and Aktietorget traded mineral exploration company, which owns several exploration projects in Sweden, is pleased to announce assay results for the first ten drillholes (approximately 951 metres) of the Company's planned 3,500 metres drilling programme on the Kallak South deposit.  The Company successfully completed a similar 32 hole drilling programme to outline its Kallak North deposit in August 2010 and, together, the two deposits form the Kallak Iron Ore Project.

The Kallak South drilling programme comprises a total of 32 holes to be drilled in a grid pattern of twelve drill profiles in an E-W direction at 200 metres spacing covering the N-S extension of the deposit as noted from ground magnetic data. Drilling commenced in late 2010, but was temporarily disrupted, following the completion of the first ten holes, by unexpected severe winter weather conditions. Drilling is currently progressing at an accelerated rate in order to make up for lost time with the programme scheduled to be completed in Q2 2011.  

The drillholes assayed to date have tested approximately 530 metres of the most northerly extension of the Kallak South deposit, which from detailed ground magnetic data is indicated to extend in a N-S direction over 2,400 metres in length with a maximum width of 400 metres in its central zone. Based on the initial drilling results and measured size of the detailed ground magnetic anomaly, the Kallak South deposit is estimated to contain more than 400 million tonnes of iron ore.

The Swedish drilling operator Ludvika Borrteknik AB is utilising light moveable rigs to complete the programme.  At each drill site, all drill cores are screened by a handheld magnetic susceptibility meter and all magnetic responding sections are identified and registered. All the drill cores are being geologically logged and the sections selected for analysis are being prepared at the ALS/Chemex laboratory in the town of Piteå in northern Sweden. Half of each drillcore is retained in storage and the other half is prepared by crushing and grinding before assaying for iron and a further 20 metallic elements using XRF techniques at the ALS laboratory in Perth. Details of the first ten drillholes and results for the assayed sections are set out in the table below:

Hole No.*

Total depth (m)

Section analysed (m)

Assay results Fe (%)



From

To

Total Width


KAL 10 033**

59.10

11.80

59.10

47.30

26.1

KAL 10 034**

74.60

13.50

64.60

51.10

29.2

KAL 10 035**

82.70

18.50

57.30

38.80

25.1

KAL 10 036**

128.80

***




KAL 10 037

100.45

1.65

100.45

98.80

30.1

KAL 10 038

includes

118.00

21.50

 

118.0

 

96.50

22.80

26.3

33.8

KAL 10 039

includes

89.90

 

9.50

 

89.90

 

80.40

37.15

29.1

34.3

KAL 10 040

includes

98.05

22.40

 

98.05

 

75.65

50.20

28.4

32.1

KAL 10 041

100.50

40.10

83.70

43.60

21.0

KAL 10 042

98.50

***




TOTAL:

950.60



532.15


Notes:      

* - all holes were drilled at an angle of 45 degrees.

** - azimuth of 90 degrees. All other other holes have an azimuth of 270 degrees.

*** - no assays selected as located outside of the limit of the deposit.

For each drill hole, the longest mineralised intercept with grades higher than 20% Fe is noted, with the length shown in metres and average grade of iron (%Fe). Notably, high grade sections of significant length with more than 30% Fe are also included.

 

Figures showing cross-sections of the drill holes with iron assay results and a map of the drill hole locations are currently being prepared and, once finalised, will be made available on the Company's website at www.beowulfmining.net.

 

As a result of the angled holes cutting an almost vertical dipping iron mineralised zone, the true thickness of the intercepted mineralised material is estimated to be 70% of the downhole length of the mineralized core in the individual borehole.

 

The above assay results confirm that the encountered mineralisation is of a generally similar high quality, quartz banded magnetic iron ore to that encountered on the Kallak North deposit. However, some minor hematite has been observed occurring on the eastern flank of the Kallak South deposit.

 

The initial drilling results have also shown that the northerly extension of the deposit is occurring beneath a glacial overburden cover of more than 15 metres thickness, which is substantially more relative to that of the Kallak North deposit where the overburden thickness noted in drillholes seldom exceeded two metres.  Occasionally abundant fracture zones have been encountered in the upper surficial part of the host bedrock surrounding the mineralisation.

 

The ongoing drilling programme is currently being carried out on planned E-W extending drillsections, which cross cut the central zone of the deposit about 1,000 metres south of the formerly drilled sections of the deposit. Initial drill results for these sections confirm the presence of high grade iron mineralisation over significant widths of up to 400 metres. Similar widths of iron mineralisation are anticipated along forthcoming parallel drillsections as identified by ground magnetic data.  

 

Both the Kallak North and the Kallak South iron ore deposits are located in close proximity to each other, being separated by only some few hundred metres in extension,within the same highly altered, Proterozoic volcanic bedrock structure. As such, the deposits are interpreted to possibly be geologically connected at greater depth to form one very large iron ore resource of much more than 600 million tonnes with a total extension of more than four kilometres.

 

An independent JORC compliant resource estimate for the Kallak North deposit, based on the Company's 2010 drilling results and historic data, has been commissioned from the Swedish consultancy company GeoVista AB at Luleå, Northern Sweden and prepared in conjunction with an international consultancy group. The report is scheduled to be completed in Q2 2011. Preliminary results indicate the presence of more than 175 million tonnes of an inferred iron ore resource. 

 

Significant additional tonnages of iron ore resources are anticipated from scheduled future drilling at Kallak North as its total N-S extension is not currently defined. High grade drill core intercepts, both at the northern and southern ends of the Kallak North deposit, have shown that the iron mineralisation extends well beyond the present drill confirmed extension area. Accordingly, additional drilling at the Kallak North deposit will be required in due course in order to define the limits of the deposit extension.

 

Bench scale metallurgical tests, including DTR (Davis Tube Recovery) tests on ore grade material from Kallak South are currently being conducted by MINPRO AB's research laboratory at Stråssa, Central Sweden in order to further assess the quality of the iron ore. The metallurgical tests are being carried out on selected large samples of ore grade drill core sections of the deposit and will be directed towards the production of a high grade magnetite pellet feed product similar to that obtained from the Kallak North deposit.

 

The Company has recently started work with respect to a planned formal application for the transfer of the existing exploration permits for the Kallak project area into an exploitation or mining licence. As outlined in Sweden's Minerals Act, a significant part of this proposed application will involve the commissioning of an Environmental Impact Study (EIS), which is intended to be carried out by an independent consultancy group with experience of similar successful assignments for other mining companies in Northern Sweden. As announced previously, in order to facilitate this process Beowulf is establishing a newly incorporated Swedish subsidiary in Stockholm.

Successful completion in due course of an EIS, together with a technical report, and the subsequent granting of an exploitation licence by the Mines Inspector will enable the Company to start pilot mining surveys and collect large scale samples from the Kallak deposits for mining and metallurgical tests. A large quantity of high quality pellet feed material can then be produced for delivery to potentially interested steel customers.

Subject to receiving all the necessary regulatory approvals by the end of 2011, pilot scale test mining and further metallurgical testing, including further DTR studies, are currently intended to commence in Q1 2012 with possible deliveries of large quantities of high quality pellet feed material to potential customers expected to potentially start later in 2012. It is anticipated that a pellet feed product can be produced relatively easily from the Kallak iron ores containing approximately 70% Fe with low levels of contaminants such as sulphur, phosphorous and titanium. Such a high quality pellet feed product is currently in high demand by potential customers.

 

Dr Jan Ola Larsson (Fil. Kand, PhD, DIC), has reviewed and approved the technical information contained within this announcement in his capacity as a qualified person, as required under the AIM rules. Dr Larsson is Technical Director of the Company and has over 30 years relevant experience within the natural resources sector.

 

Enquiries:

 

Beowulf Mining Plc


Clive Sinclair-Poulton, Chairman

Tel: +353 (0)85 739 2674



Strand Hanson Limited


Matthew Chandler / Simon Raggett

Tel: +44 (0) 207 409 3494



Alexander David Securities Limited


David Scott

Tel: +44 (0) 207 448 9820



Lothbury Financial Services Limited


Gary Middleton / Michael Padley

Tel: +44 (0) 207 686 2010

or visit http://www.beowulfmining.net


 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUASNRARAOUAR